kaysg
Hi everyone,
I have been playing around with Anyrail for a few months now and could really use some feedback. the vision for this plan is to run mostly North East regional amtrak trains and a few intermodal trains. I am not trying to be particularly prototypical - just love modern equipment.
My goal is to operate as many trains as i can simultaneously - will rely on the computer to handle much of that complexity - though that will be a long while off.
I have limited access to the back of the layout due to it being planned to sit in the first few feet of the unfinished crawlspace that extends from the half of the basement that is finished. I haven't played with hights of track yet - suggestions welcome.
Kaysg

Steve Raiford
Welcome to the AR forum.
I am currently in the build stage of a computer controlled layout. I won't address your specific layout, but will just pass on a few "automatic control by computer" tips that are significant at this point in your design.
Each electrical block of track, must be longer than your longest train.
To run trains smoothly and automatically, one behind the other without stopping at the end of each block, requires a minimum of three blocks for each train.
So if you have a simple circle with 8 blocks, you will be able to run 2 trains, one behind the other without either train haveing to stop because of an occupied block. ( Of course if one is faster than the other, it will have to stop because of speed.)
Can you have blocks shorter than a train? Yes you can, and you will, but these short blocks "don't count" to satisfy the 3 blocks per train rule.
Decide on maximum train length.
Decide on an ideal minimum block length ( Train length plus distance for stopping at block signal.)
Minimize number of short blocks.
And of course the best part is you can do this "on paper" with AR long before laying the first piece of track.
Good Luck
Steve Raiford
RhB_HJ
Hi Kaysg,
Welcome to AR!
OK, NorthEast with Amtrak and intermodal, hmmm ... if it were me I'd put in a double track line to get North and South bound on a separate track.
How long are those Intermodals in the East? Out here they are anywhere between 80 and 160 cars; so the Intermodal length will govern the rest. Amtrak trains can be short i.e. 4 to 6 cars, to make things more interesting I'd mix in one of the local commuter outfits. And to give you something to do - watching automatic action is not all that taxing ;) :) - I'd put in a small industrial area so you can run a local.
BTW lots of action without having the same trains come by time after time will call for some sort of staging. I've downloaded your plan to see how I would arrange "things", going on the assumption that this plays in a slightly suburban area etc. etc.
Cheers
HJ
kaysg
Thanks everyone for weighing in with your thoughts about blocking and block sizing. I have been thinking about block sizing for a long time and am intentionally ignoring standard modeling practice of attempting to create blocks larger than my largest train.
Though not represented yet in the layout plans, my thought is to locate occupancy detectors about a half train length apart in most regions of the layout, more in yards, and around switches. My goal longterm is to model a safety regime for successive trains where a leading trains can hit a wall (infinite deceleration)and the following train will be able to apply emergency braking and stop before the rear of the leading train + a small margin of error (ie block size is tiny). That said, i know that is a long time off and a lot of integration of detectors and computer logic. (plus i have some ideas about the transit line capacity).
First i need to build me some track. I agree that a double mainline is essential, and i think i have one in there. Also i see the loop (the right leg of the "L") as providing for industry/port/engine service. meanwhile the center zone acts as a staging yard and intermodal transfer station. Scenery will come - think older industrial city near Port Elizabeth NJ with marshes and truck farms interspersed by lots of single track lines going every which way.
Kaysg
Steve Raiford
Kaysg
Yes - larger blocks are sometimes difficult to deal with.
I don't know what type of software you intend to use. JMRI has some good open source code. Railraod & Company in Germany sells a product called "TrainController", my preference, or maybe you are planning on writing your own.
Regardless of the system, being able to tell when a train is occupying any portion of a block is the fundamental principal that all systems are built around, including the real ones. The consensus of most users is that he best mechanism is to detect current flow to the block. Individual detectors such as reflective optical sensors can tell you when train covers a particular spot, but it will take several detectors to define a block. Gaps between cars can also cause issues
You probably are years away, and thinking of blocks is the important concept to grasp at this point.
I will also add that you want to verify that you can easily reach every inch of track somehow. Murphy will always derail a train in the place that is most inconvenient. I'm not sure I could reach several parts of your proposed layout.
Steve Raiford
kaysg
Totally agree that blocks are the basis on which railroad control is based and i am years away from the level of automation / control that in envision - i have been planning control methodologies for my model for 8 years already, i am moving forward by putting them into practice just getting this thing planned.
Any thoughts on the my layout plan - I figure i have a few more iterations of layout design before even considering bench-work construction.
As for access, I have access its just not fun or pretty. In a perfect world i would have a climate controlled warehouse for my dream layout that just goes on and on and on. but in reality i have a warm dry basement with an out of the way corner that has power and access.
-Kaysg
RhB_HJ
That's why I like doing proto research; plug in "Amtrak+NJ" and what do you get
Northeast Corridor, North Jersey Coast Line and Midtown Direct service is temporarily suspended due to Amtrak low voltage power problem.
;) :)
Still looking to see what's there around that area.
Cheers
HJ
PS looks like a lot of roads, a lot of marsh and swampy areas and some abandoned rail lines. Perhaps I'm looking in the wrong place. ???
peartree
For my two cents, remember that DETECTION blocks and ELECTRICAL POWER blocks don't have to be the same thing. You can let the following train run into the block behind the stopped train, then run forward at reduced speed until it hits a smaller detection block behind the stopped train.
p.s. Having grown up in the area, I can answer any questions you might have about NYC/PC/Amtrak/Metro North operations from New York City north.
If you want to model that area, you get decent mountains, none of which you have to engineer a way over, and a choice of either a 2 or 4 track main line. Your biggest problem is lack of space (in HO, anyway).
RhB_HJ
Questions:
What does that large rectangle on the left hand represent?
Doesn't NE Amtrak run under the wire?
What about the ship and the water on the right wall? could/should that be part of Intermodal?
When you write "My goal is to operate as many trains as i can simultaneously", are you after train density on the double track main and/or general action including switching the industrial area etc. (if any)?
Does inclusion of the turntable/roundhouse justify an engine facility or could that be part of the South Jersey Railroad Museum, which "relocated"?
BTW I'm done designing "Staging", now comes the fun on the visible level.
As Steve mentioned accessibility will be the big ??? ???, in which case I always try to follow the KISS principle in the sections Mr.Murphy is fond of. We'll see how that goes. ;) :)
peartree
"Doesn't NE Amtrak run under the wire?"
Amtrak runs under catenary from New York City (actually Sunnyside Yard in Queens- across the river from Manhatten, to the east) to Washington D.C. East of NYC, it runs third rail for a way, but I don't think it's under wire all the way to Boston! North of NYC it's third rail until Croton-Harmon (3-7 car MU's all the way for Metro North) and FL-9's (a diesel/electric variation of the old F9) for Amtrak. Metro North customers from as far north as Poughkeepsie change trains, usually, at Croton-Harmon, and make the rest of the trip on an EMU most of the time. Really heavy trains (5-7 cars) from Poughkeepsie can have so many passengers that they trot out old second-hand coaches (streamline and heavy-weight) to carry the load. In that case, the old coaches are pulled by a leased FL-9.
IMO, if you want the Amtrak traffic, but don't want to mess with catenary, modeling the big 4-track mainline north is a good way to generate traffic. It was converted from 4-track to 2-track between 1970 and 1980.
RhB_HJ
Whenever someone is after "lots of action" things tend to get interesting. As mentioned "lots of action" will almost always call for reasonable size staging, unless one is prepared for the same trains showing up again and again and again.
To avoid that I move certain traffic patterns to the "netherworld". In this case a sneak by-pass to allow the Southbound traffic to become Northbound. In order to balance things there needs to be a similar connection to switch from North to Southbound, that will happen via the single track line that runs by the turntable in the original plan.
That single track line is bi-directional, supposedly the connector to a nearby yard, as well as the spur line for NJTransit in Push-Pull mode.
The hidden by-pass in staging can also be used as a layover track, with trains stacked if necessary or desirable.
Cheers
HJ
@ Jeff
But leaving things in "Joisy" should be interesting enough. ;) :)
kaysg
HJ -
The rectangle is a major brick column supporting my house. Also I have reoriented the N arrow to point north.
Amtrak runs under catenary from DC to Boston (maybe third rail in queens but pretty sure not) this was not always so but with the advent of the Acela the section from Hartford to Boston was electrified and there is no longer the need to switch engines in Hartford.
I will not be modeling catenary in N scale, nope. I will just let my imagination fill in the missing pieces.
Staging is cool- staging is not cool if it requires me jackhammering out a retaining wall & Slab in my basement - for all practical purposes there would be zero access from the north side of the layout in a lower staging yard. I can see that you kept it really simple - and it looks great, i have a lot to learn but i just don't think its going to happen
Jeff -
Didn't know that about the Poughkeepsie line. I did know that back in the mid 90's there was never ending discussion of extending Metro North to Hudson - wish they did because it would have made my life easier.
I rode the North East Corridor every day for nearly two years commuting to grad school from NYC. I noticed a couple of things. except for the train number the regional service was exactly alike one another. there were exactly 4 types of amtrak passenger trains: The Acela, The regional trains to/from Washington DC, The Keystone which ran from NYC to Harrisburg PA via Philadelphia, and all of the other trains that never ever were on time and therefore don't matter. This is all a long winded way of saying that the same train passing is actually kinda prototypical.
I think i said that i do not intend to run prototypical service on this layout but to let regional amtrak be the theme. However i love the mix of shipping and trains that intermodal shipping represents. Probably goes back to working on a tugboat in NY Harbor where occasionally moved a loaded car float and tooled around under container cranes in Redhook Brooklyn. So having to move some container trains about - shift them around and drop them back off at a boat is very cool - and allows me some switching action when i get bored of passenger service.
And if i get really bored i can always start a PATH service from the station through the docks and into a tunnel as a shuttle.
-Kaysg
RhB_HJ
Hi Kaysg,
Not to worry, I treat this as practice ;), it's good for the gray matter. More so since I'm still in the learning stages with AR (as you can tell by my wish list suggestions). ;D
Having someone provide the virtual space along with the planned theme is kind of handy. What results from my end are only suggestions what I would do with any given space, along with the method behind the madness.
Yep, that rectangular blob looked a lot like some brick column, those are a lot harder to camouflage than the metal posts.
Regarding the access to staging and the connecting tracks to the upper, scenicked level, I intentionally left that track straight with as little grade as possible, given the clearance requirements. In addition my suggestion would be: build the top level at a height to give you the railfan feel - few of us go railfanning in a helicopter and from my experience hiking up the hills (or for that matter mountains) doesn't seem all that popular either. :) With easy vertical clearance even the back can be accessed from the front. That's only a matter of planning and construction methods.
On another note, I'm planning to get a copy of Train Player; that could be interesting to try out the operational possibilities of any number of layouts i.e. one more toy, errrrr I mean tool, to play with. ;) :)
Cheers
HJ
kaysg
Thanks HJ, I do appreciate your suggestions, and your wish list is pushing me past my "yeah, but..." stage. I really like the idea of the staging yard. A little (a lot) afraid of the expense that this would imply, and probably more important is the fact that i would need to do this phase first with all detection blocks before i could get to the layout i want to play with.... well we will see. Technically i have more space to work with if i continue pushing west on the layout (another 12 feet or so) but that starts to get caught up in some other issues. I will post some ideas later tonight or tomorrow.
Kaysg
peartree
HJ- "hiking up the hills (or for that matter mountains) doesn't seem all that popular either"... Not an issue in the northeast with railroading- there aren't any mountains on the routes he wants to model :)
kaysg- Staging is always a good thing, if at all possible, when modeling several hundred miles in a space less than 20 feet long :). I understand about modeling catenary in N scale, but I assure you that it's being done every day and the parts are all available via Walthers. Now, this may not make you think about switching (pun not really wanted), but just to let you know that it IS there.
Now, HJ, I own TrainPlayer and while it's not perfect (not anywhere near as perfect as AR, of course!), it can be a useful tool.
kaysg
Good point about building this at eye level, i have made another pass at the layout incorporating the staging yard to the West of the main layout, so that the majority of the yard is not under the main layout - because room plan this western extension would be hidden from view from most people so i had not considered it for modeling. However as a place to store some really long trains.
Jeff and HJ thanks so much for you comments so far. I have simplified version 2 of the plan. what are your thoughts.
-Kaysg
RhB_HJ
And this is how one could "wrangle" the visible portion. For my taste I would designate the roundhouse as a museum, in which case there are lots of excuses to run all kinds of "unlikely" rolling stock.
Except for the tracks behind the column (North of the mainline), the tracks are within easy reach which makes switching more fun. To switch the industries on the North side will be "interesting", but it all depends from which direction the wayfreight gets into town. ;) And how much traffic the dispatcher throws at the works. ;D
kaysg
HJ-
I like the story you tell about a railroad museum - I know that i have always wanted to have a turntable on a layout so i tossed it in. Also lets be honest, at some point i will want to run steam and this gives me an excuse to store them on the layout. but frankly i just want to play with it.
Took some measeurments this morning and there is absolutly no way to have a lower level on the leg of the "L" that juts out to the south because of a huge stack of Flat Files.
Kaysg
RhB_HJ
kaysg,
There's always ""Plan B". ;D ;D 8)
If you have the (extra) room use it and develop the theme from there .... using visible staging camouflaged as a larger yard. Having the arrival and departure tracks for a freight yard right up front (South edge in the "addition"). Kind of hard to tell if they're arriving or departing when they're standing still (perfect!) :o :o.
Layover tracks for the passenger stuff on the other side (North) of the mainline.
Plus a few other things on the original portion.
I'll modify the footprint to reflect the "new and enhanced" conditions to see what the possibilities are.
Cheers
HJ
RhB_HJ
kaysg,
Please have a look at the footprint and mark any obstructions as well as the minimum height above floor. What would also be interesting - for lighting purposes - how high is the ceiling and is it finsihed?
Have you considered using the top of that flat file cabinet as the "HaF" (Height above Floor)? how high is it?