This layout will go on part of a shelf that's 8 feet wide by 2 feet deep. The tracks (Atlas code 80) will take up about 4 feet of the shelf length. On the attached plan (designed as a twice-around by up-and-over), P with a number is where I intend to put the pieces of an Atlas pier set, the bridge will go between the two P12 locations, and the T in the left corner on the bottom is the feeder location. By my calculation, grade on the layout is:
Inside loop (to bridge) = 2.9% going up
Outside loop (starting at bridge) = 2.74% going down
I was wondering if these grades are correct as Atlas' specifications are for a 2.8% grade with piers at 5-inch spacing.
Scenery will be constructed after approximately one year of track set-up, wiring, and running trains, with plans calling for pre-built structures including a station.