Well, it's a good thing that this happened. It's caused me to take a much closer look at what you had. Now I can see how many things I feel needed a tweak and a nudge. That's not a criticism of you, but more to do with me being annoyed with myself.
Ready? Here we go...
1- I moved the fiddle yard. I had to assume that the gray surrounding color was some kind of scenery blocker. This is a big problem, as I assume that the layout is meant to be seen and operated from the inside of the 'L' shape. I think it would seriously detract from the layout appearance, so I shortened it some and put it to the left side of things. In the new scheme of things, I'd use a nice chunk of mountainside to hide that yard. It would look good and help in the Highland setting.
2- I smoothed out the somewhat tight and awkward-looking curve at the top left of the mainline.
3- I rearranged the turntable slightly (so that there are storage tracks every other slot, rather than every third slot).
4- I bent the Heritage station around the end of the layout, guessing that it sits above the mainline railway. More mountain is meant to wrap around that entire half of the layout, really. If I'm wrong about that elevation setting, then it can be arranged to run along a river valley with little trouble.
5- I added the mainline loops down at that end of the layout, as you can see. It doesn't hurt to have the mainline be a real operational and scenic plus, even if your heart is with the Heritage line :). You can stretch your modeling muscles by building some spectacular bridges across valleys, dips, and that possible river.
I think that's it. Normally, I'd let this much of an edit sit around for a day or so to let it age and perhaps show up anything I missed. In this case, I think you've sat by enough (and very politely, thank you), so here it is...
