Capt. Brigg
This is the second update to my Pacific Cascade Ry track plan. I invite suggestions and constructive criticism. I'm having some trouble putting yards into the layout. I build and lay my own turnouts and hand lay most of the other track except for some hidden areas. The upper/outer loop has to be at least 4" above the staging area and the lower/inner loop is at 0". The lift out bridge is an unusual track design with four frogs and two sets of rails on the same roadbed on the bridge, it's actually a veeeerrrry long crossing. I have actually seen this odd rail structure on a narrow bridge. It will be interesting to build.

David
I would advise you to switch 'Bedding' on in the 'Home' tab. I'm afraid some of the track overlaps.
Even then, it might very well be that the parallel track is too close together.
David.
peartree
You'll have to forgive David. He's never seen what we in the States call 'gantlet track'. This is not at all a terribly rare situation. It happens because railroad bridges, especially old and LARGE railroad bridges cost too much to replace as they age. So, to lighten possible loads, two different tracks are almost combined into one. The parallel tracks almost cross. The two tracks cross to the extent that one rail crosses a rail of the other track, just as it would in a turnout, but the other rail never does. The result is two tracks in almost the same space as a normal one track. This keeps the load of modern trains toward the center of the deck of the bridge, but without creating a pair of turnouts and the extra maintenance cost of even more frogs and movable points. Having lived within sight of such a bridge for several years, I can tell you it works well. With the loss of much of the passenger traffic on anything butt really main lines, it never seemed to generate anything in the way of traffic tie-ups.
Now on to the comments. It's very hard to know what to say. How about telling us something about the layout concept, what you'd like it to do (industrial? mainline operation? switching?...), and the kind of time period you prefer? Once we have that info, we can offer concrete suggestions and comments. Just looking at it and taking the name into account, I would guess 1860 - 1890 time period with a standard gauge, but serving many of the areas that one would consider narrow gauge and perhaps serving logging with a sideline in mining?
David
@Jeff: We have that in Holland too! I thought you had plenty of room there in the States!
Here's an example of tram track in Amsterdam:
http://nl.wikipedia.org/wiki/Bestand:Strengelspoor_Leidsestraat.jpg
But in the example in the OP, I'm not sure the space was intended to be used like that.
David.
peartree
"The lift out bridge is an unusual track design with two frogs and two sets of rails on the same roadbed on the bridge"
Yep, that's what he intends :). And yes, I had forgotten the tram tracks in your country. Pardonable, I think, since the last time I saw them was 45 years ago.
David
OK, but I was referring to the curved sidings at the east west side. Sorry!
David.
peartree
Oh! You mean that section over there between Yreka and the lumberyard? Yes, but he explained that he was using Piko track because of the curved turnouts (not having noticed that Atlas Code 83 HO and several others also have them). I suspect that that 'overlapping' situation was because he couldn't find a curved turnout to fit the point he wants to connect to. He's hand-laying his track, so he can make something to fit that won't show up in any manufacturer's catalog.
David
Sorry, where I said East I meant West.
David.
peartree
Ah! Ok, in that case, I agree- he'll need to adjust that a little bit to provide clearance, even with smaller, shorter cars.
Capt. Brigg
David, If you are referring to the curved yard at Ellensburg, I am having trouble putting down what I want with the CAD program. The staging area comes out of a tunnel and crosses the main line and then has to have 18" radius to stay inside the main. I'll have the same problem of a curved yard over in Centralia.
The lift out bridge is actually a very long crossing of the main, sort of a gantlet to create a double round main line. The four frogs will be off the bridge. I had thought of having switches at each end for more movement options and make the "Y" a real reversing rail structure, but that makes things too easy. I'm not into easy.
The layout is fictitious time continuation of the Cowlitz, Chehalis & Cascade (C.C.&C.), a logging road that abandoned at Cowlitz, WA in the 1930s after hauling freight for the Mayfield dam on the Cowlitz river. The GN, NP and SP&S should have bought out the CC&C and extended the line to Yakima as was originally planned. The era I will be modeling will be the 1950 - 1970 prior to the Burlington Northern merger, mostly diesel. The power and freight will be much the same as was seen on the SP&S at the time. My Grandfather was a Fireman on the SP&S in the 50s. Since I want to be able to run a through freight by computer program, I started with the double round main line. But I also want to do some switching in two small yards. Don't we all want everything? Yreka is actually Rimrock, WA. but it was 2:00 am when I named it. I'll change the name. The line should have interchanged with GN, UP, NP & SP&S at Chehalis, some of the original trackage is still there, and with NP & Milwaukee at Ellensburg, with trackage rights on NP to Ellensburg up the Yakima river. I have historic pictures of the line and have found much of the original road bed. Is this too much information?
peartree
No, not at all too much information. On the other hand, I think it may be too much railroad for too little space, unless you can consider shifting to a smaller scale. If you'll post the .any file for the layout, I think I can clear up some of the trouble spots for you...
Capt. Brigg
I've moved several things around since my first post. But feel free to move more things around. If I don't like it I can always go back to an earlier version. I appreciate new ideas and good suggestions. I'm hoping to make the upper/back loop a mountain helper electrified district. I also added a trolley line in Yreka. Yes it may be too much, but so far it's all on paper/computer screen.
The lower loop, previously NP, now BNSF, follows the Yakima river with very steep vertical walls just off the track. I don't know it that can be modeled on AnyRail. However, it does give more room at Rimrock and Onalaska. Remember the staging track is under the upper level, another probable problem of access.
I'm still having problems with the Maximum Percentage input frame in the slopes/settings area of AnyRail. I think it must be a bug in the copy of the software I downloaded. I might try downloading it to another computer to see if it corrects itself.
peartree
Cap'n your input box issue may be your video driver. I run one copy on my laptop under Win XP Pro and I have that problem. And it's not just with that one box, but most of the 2-4 character/number boxes. On my Vista system, it doesn't happen. A workaround goes like this- Click on the input box PREVIOUS to the percentage box and hit Tab to get the cursor into the percentage box. Input the number you know you want. Hit Tab again to activate the number. I know that's not ideal, but it will get your layout done while David digs into AR's guts to find the bug.
Now on to the layout. Thanks for the further info. There's no such thing as too much. If I can find things to 'improve' on, you probably will find that I've used other track systems to illustrate. I realize that you'll be hand-laying track, but it does help to have a guide that's as good as possible.
By the way, what's the idea behind the Yakima Electric track? Is it a streetcar line or Interurban or...?
"Remember the staging track is under the upper level, another probable problem of access."
Probably will be. That's one of those things you have to work out on-site. One way of handling it is to suspend the sub-roadbed and leave the rest open-grid.
peartree
p.s. There's something funky about the way you've got the layers set up. I can't seem to add Lines or Surfaces, because they end up behind your Benchwork layer, even though I Unglued everything and did my best to send the benchwork to the background. Also, some of the trackwork you think is on one layer shows up on others instead. Take a look, please.
Capt. Brigg
Jeff,
I noticed the thing about the bench work layer myself as I was trying to add a hillside between the lower and upper track. When I started the new form in the middle of the layout white space it showed up, but as I moved it to the layout it wanted to slide under the bench work. When I changed the hillside height to 2 it then slid over the layout. I have somehow set the table top to a height of one. I have now changed the line height of the bench work top to zero, that should fix the problem.
I also noticed that several sections of track got posted to the wrong layer, so I reset each section to it's proper place. When laying down track I still sometimes forget to change the layers. I did use your suggestion on the maximum percentage of slopes input frame. I can't see the result so I don't know if it worked. None of the other input frames have that problem.
Yes the Yakima Electric is an interurban streetcar, which still exists in Yakima, sort of. I like electric cantenary. I may try to electrify the upper mountain district as the Milwaukee once did.
I'm attaching the evenings changes to the file.
.JPG)
peartree
Hmm. Your layout is interesting. I was wondering how you could make more of the YVT (yes, I've seen the current legacy museum's website, too). Their web site was a little light on the line's history and there isn't much else online about it. Did it extend as far as Ellensburg? I was thinking that a couple of short sidings into a car barn on one end and maybe a loop or pass-by at one end might be nice...
Capt. Brigg
Here is the latest version of the Pacific Cascade Ry. I'd still like to place a grain elevator along the river for sending grain hoppers into. Any suggestions on any of the areas will be well considered.
peartree
Now it's evolved into something more like a real track plan. I offer you a small tweak- I moved the grain elevator around to where the track passes under the loading pipe roof. I also smoothed a couple of things like curves and added a small siding. One last item is that I think you should change the Lumberyard to a furniture factory. Having been around a real furniture factory, I can tell you that they are quite prepared to take in lumber and send out boxcars of whatever you want. I know you're going for that 'loads in/empties out' effect, but that is easier with boxcars going out of the sawmill and into the factory.
Capt. Brigg
I like the idea of the furniture factory and made the change. I want to run center sill flatcars with and without lumber. We have lots and lots of them in the northwest.
I don't see the reason for the short siding in the upper left outer loop over the river. I've been worrying about the river going off the left side of the layout. I don't want to get the floor wet, (ha ha.) But, the real river problem is, if the rails go over the river, then the river bed will be too low to go over the staging area under it. I will be trying a sharp northward bend in the river valley and have it disappear much as the real river does. You can see in the attached picture taken north of Yakima the river is winding and the valley steep. Thanks for your ideas. I'm still building. ;D
.JPG)
peartree
In my experience, there's no such thing as too many sidings. You can always find another commercial use for a siding, even if it's only a team track. As for the river itself, I didn't touch it. I looked for a spot where you could possibly move the grain elevator close to it, but the layout is just too crowded to contemplate that. In fact, if I was you, I'd think seriously about switching to N scale (does that sound biased?). It only makes sense to go to a smaller scale if you need more room.