Attached is my latest revision of the SP&K. An N scale layout to be built from Kato Unitrack. This is a two level layout with the transition between levels running around the room.
The layout will be controlled with RailRoad and Company Train Controller computer software so block lengths are the highest priority design consideration.
Please - all comments and suggestions are welcome. I prefer to remove the gremlins from paper instead of benchwork and track.
Thanks
Steve Raiford