The attached track plan is the beginning of a new layout I plan to start on this fall. I would appreciate your comments, criticisms, feedback, and suggestions as you deem appropriate.
First allow me to give you some background.
The SP&K is a totally fictitious railroad that is not designed to any particular prototype or era even though the three towns represented by the initials are real and either still, or did have a railroad at one time. They are the small towns of Stuyvesant, Poolsburgh, and Kinderhook near where I grew up in New York.
The primary focus of the SP&K is to carry passengers, followed by long haul freight, and hopefully enough local freight to provide some operational interest.
This is an “N” scale layout, and will be constructed in what was formerly called the “living room” of my home, a space approximately 12 ft x 13 ft. Track will be Kato Unitrack, and modified Unitrack sections.
The tightest curves are 15 Inch radius, the maximum grade is less than 4%. Main line is about 140 ft. The transition grade between the upper and lower deck consumes about 90ft. The storage area will hold 16 complete trains. (Engines and cars.) All trackage will be electrically blocked for computer control and eventual signaling. Trains of at least 5’ 6” in length will be accommodated. The basic layout of the upper level is a twice around loop. There are no reversing sections, but there are several crossovers and sidings.
The sections of track that look narrower in the drawings are Unitrack sections that have been modified.
The lower level will be approximately 30 inches from the floor, normal desk height so it can be comfortably reached while seated.
The upper level will be approximately 46 inches from the floor. Maybe a little low for you 6 footers, but ideal for the vertically challenged.
Lower Level
A complete train can be stored in each of the red and each of the blue storage tracks. Trains face in the upward direction in the storage yard as shown on the plan. Yet to be determined industries will be located in each balloon. The upper one most likely will be mountainous to support the rising grade of the transition track, which is several inches above this level. (See transistion level layer.)
Transition track
RED is the UP track, BLUE is the DOWN track. The grades are approximately 45 feet in length, and less than 4% maximum.
Upper Level
The yellow track is for RDC units to shuttle passengers from outlying stations to the main station. Two trains can operate simultaneously, passing at the station loading platform. The normal yard for the RDC trains is at this level, but they can be sent to the main storage yard on the lower level also. There is a desk under the RDC storage yard.
The passenger loading platforms are in the back of the station. Both main lines passing the station have a passenger siding for the station.
The crossovers provide different routes, and the opportunity to go the wrong way and be unable to reach a destination. Several mainline sidings provide for allowing the passenger trains to pass slower freights and stay on schedule.
Local industrial sidings are served from passing tracks so that the main remains open during local freight switching.
Please share your thoughts.
Thanks
Steve Raiford