peartree
This is something that would help me and I don't think it fits under current controls. I'd like an auxiliary to the Create Section command called Create Mainline, perhaps. Something that would let us mark a route as the mainline without adding in all the sidings, etc. Then list it separately in the materials list. Also, it is imperative that it not be handled the way that sections are- no isolators or gaps or following turnouts or anything. It would be great to use for tracking mainlines through complicated turnouts and yards.
The rest of you please spare me the lecture on layers and selecting. This may be just me wanting the control, but it would save me soooo much time when working on layouts, not to mention being able to tell how much track has been put into the mainline.
santerdam
Jeff wrote
The rest of you please spare me ......
Be aware you are posting on a forum. This is not a private area !
Sander
Nicholas of the Grove
Isn't that more-or-less the same as what I do with layers? As stated elsewhere, I put the track to be controlled by each controller into its own layer, so your requirement could be covered in the same way. Then, if David is able to fulfil my earlier request, the materials for the mainline will show up as you require.
Nick, Tasmania
peartree
@David K.- You define it simply by selecting the two end points of the track you want to designate as a mainline. An orange 'glow' or something else unique would be a nice way to tell. Currently, it's possible to Select track in this manner, but the lack is a way to put a permanent tag on it in any way.
@Abbonc- Which is why I said 'please don't bother me with layers' specifically. I find that working with layers is EXTREMELY inconvenient as a way to distinguish track BECAUSE there is no way to visibly tag the track that belongs to a layer when more than one is visible. The point here being that it's close to humanly impossible to make a design involving track on more than one layer without having all of them turned on. Try it some time.
@santerdam- Yeah, I was just hoping to save people some typing time... (shrugs)
Nicholas of the Grove
What I do would probably qualify as a "workaround" for you, Jeff.
I simply have all the sections in the layer the same colour. This, however, is not ideal, as a section can, of course, include sidings.
Perhaps another wish would be the ability to set the colour of a piece rather than a whole section.
Nick, Tasmania
peartree
David,
I think that editing the mainline might be handled one of two ways- either make it a sticky tag, in which case, taking bits out or adding them would work just like editing a section does, currently. Or the second way- make it very transitory (the one I'd prefer), in which if you break the mainline selection, it goes pop and you have to reselect a mainline after any edit.
The second way works ok for me, since the whole idea of mainline highlighting is merely a visual aid for following the main route(s) through complicated trackwork or yards. Most especially the latter. I often have yards where the end or ends extend off-screen, making keeping track of the mainline nearly impossible. I might decide that it should work as in example 1 above if given the chance to try it out. The most important part of it is the main- select both ends and mark the route. If it's in that line, then by definition, it's part of the main and if it gets taken out, then it isn't and stops glowing.
As for making the screen look "messy" due to one more colored line... have you actually LOOKED at most of the plans published in the Track Plans forum? One more line, especially this temporary a one, might actually get lost in all the color, if it's not done as an outlining 'glow', rather than just coloring of track as it's done in sections.
@abbonc- Well, coloring is another issue. I'm not a big fan of the way that Windows handles colors. It's almost impossible to repeat colors, since adding things to the 'Custom colors' panel is not choice that sticks around long. Any use of another app will clear the custom table, whether or not you're editing colors.
peartree
I knew I'd have to explain this further. David, as soon as you zoom in to the growing end of a 12 foot long yard that has maybe 12 tracks and maybe has another line coming into it in a junction and has engine service facilities included, you will notice that the mainline kind of looks like all the other two dozen or so tracks in view. This gives me a headache. I don't like headaches, so I suggested that perhaps a little extra coloring in these situations would be ok. Not only that, but throw in the 30-50 turnouts involved and adding isolators, then changing them as you edit, becomes its own headache.
I hope this clarifies matters as I see them.
Nicholas of the Grove
Jeff, I'm not a great fan of Windows colour system either!
I did ask (in another topic) whether we could have the honeycomb colour selector included, which would make it easier to select the same colour repeatedly.
For my own plan, I have overcome the hassle this way:
I have been drawing my hills as contours as shown on maps. Each contour is a different shade of green, which I achieved as follows:
1. Set up an index in my Notes area, consisting of several small rectangles (50x25mm) with legend alongside.
2. Selected first one.
3. Set the height to suit.
4. Selected Colour
5. Clicked on More colours.
6. Selected the green third from left, top row.
7. Moved the slider on the spectrum down to the point where Red and Blue had a value of 0, and Green was 50.
8. Hit OK.
9. Repeated for remaining rectangles, increasing green value by 25 each time. When value reached 255 (I think), the Red and Blue came back into play, but I had enough contours by then!
To create a contour, I simply copy and paste the appropriate rectangle into the general area required, and manipulate it to what I want.
Works for me!
Nick, Tasmania
peartree
David K Smith wrote
Well, in theory there shouldn't be 30-50 turnouts on the mainline itself, so there wouldn't be a lot of isolators to add to make the mainline another color using sections... just saying...
(ducks to avoid flying objects)
Shouldn't??? Have you seen any of my layouts? Check out the one in Examples :) I happen to have 50 or so sitting in a box upstairs, so I don't try to limit myself...
peartree
abbonc- Yes, I saw that, but even that systems isn't good. It offers no easily repeatable color choice. I want the good old RGB 0-255 system, I guess. You can always have sliders for each color, to make it faster, but how else can you get colors right on?
p.s. Good work-around, tho. I may try that.
Steve Raiford
What I have done is to section all track on the mainline, and select a common color for mailline trackage such as "red". If I need the exact lenght of mainline I can refer to the section list.
Actually I have to go thru this process to determine that all of my section blocks are long enough to hold a complete train. A fundamental requirement for automatic control. so its not even any extra work.
Steve Raiford
santerdam
Steve Raiford wrote
(...)
If I need the exact lenght of mainline I can refer to the section list.
(...)
Steve Raiford
Just select the track and AR will show the lenght in the status bar. Sometimes a very handy feature and you don't need to restrict to sections only.
Sander
peartree
Actually, I agree with some of your points. Real railroads do try to keep turnouts off the mainline unless needed. I'm sorry, but I don't see at what point 2 isolators will be enough to create a section from the main line in your example, unless you're referring to the two lines overlapped by the circled '1' on the plan as a mainline.
Finally, I thought I made it clear that the example I designed wasn't practical for anything but a large club. Nor did I infer anywhere that I thought any one AR user would attempt such.
On the other hand, as in real life, some AR user can come along and find LDE's (Layout Design Elements) in the big picture. In fact, I am guessing that the diagram above was lifted from some larger design.
Now, I'd prefer not to have anything like 30-50 turnouts in the mainline of any reasonably small layout, but why let the software impose extra loads on users if they choose to do so? That's like saying, in the case of one memorable recent layout we both played around with, that no real railroad would have a loop connected that way, so AR shouldn't have any easy ways to let you do that. This is a WISH list forum and so I choose to put my wish for a tool to make designating the mainline easy and quick, to let me keep track of the mainline throughout areas of the layout that are too large to edit close up and still see both ends.
p.s. in your example, you've got 10 turnouts in one yard alone that intersect the mainline. You're well on the way to 30 turnouts and that's just one yard and not an entire layout :)