I have started a new layout based on the short line railroad that runs through our town. It is loosely based on the Stillwater Central Railroad and I wanted to model something with a local flavor.
History and operations are as follows:
The SLWC operates over 275 miles of track and interchanges with the BNSF, Grainbelt Corporation, South Kansas and Oklahoma Railroad and Union Pacific. Commodities that are hauled are aggregates, brick and cement, food and feed products, chemicals, forest products (paper, lumber, pulp), coal, metallic ores and minerals, construction and demolition debris, steel and scrap.
Let's start first with the
Tulsa staging: On November 16, 2009, unit trains of rock began moving out of the Greenhill Materials quarry (northeast of Tulsa in Owasso) to its sister company, Oklahoma Construction Materials in OKC. The Stillwater Central supplies the power, the cars, the crews to move the train and training to allow the Greenhill team to operate the train so they could load the cars. The trains run twice a week with 50 to 60 cars. I will simulate this with a unit train on the ready in the Tulsa staging. I have incorporated a reversing section in OKC so the unit train can travel from the hidden staging in Tulsa and return without having to go all the way around the layout. The unit train utilizes rapid discharge hoppers and the train will slowly pass over the unloading pit and empty its loads and then return to the Tulsa staging. The pit is emptied by use of a conveyor into waiting trucks or stored in the yard of Oklahoma Construction materials.
Sapulpa: I will represent Paragon Industries (manufacturer of line pipe, oil country tubular pipe, standard pipe and pipe piles). Besides loading on trucks and barges, they can load 89' flat cars, 60' bulk head flats and open top gondolas.
Oklahoma City: The unit train will unload Oklahoma Construction Materials mentioned above. I may modify the plan and have other transloading facilities located there. (not quite sure just yet) There also may be mechanical services located there.
Lawton/Ft. Sill: Transloading services for an oil company. Several tank cars are frequently seen here where crude oil is pumped from the tank cars into waiting trucks. Occasionally there is unloading of construction materials for various lumber yards here. Also, the grain elevator will be standing by for the wheat harvest season. I may even have an occasional troop train of tanks, artillery etc. coming out of Ft. Sill heading to interchange in Altus or even Tulsa for points beyond.
Snyder: This is where the line ends, but there is trackage rights on to Altus where there is interchange with BNSF. Snyder will have a grain facility since there is an interchange with Grainbelt Corporation (GNBC), an affiliate of Farmrail Company (FMRC) which travels north to Clinton and Enid.
So with this layout, there will be a diversity of motive power represented (SLWC, BNSF, UP, GNBC) at any given time. Also it will provide for all kinds of rolling stock. I can operate this as a point-to-point or if I prefer I can just let trains run.
There are 6 modules for this layout and typical construction of the modules are with 1x4's and will have a plywood top attached and then extruded foam. The framework for the bench work is completed except for the plywood top and extruded foam. I have already run the BUS wires , mounted the auto-reverse module, and the auto-switch for the programming track underneath the layout. This layout is DCC and I will be using the NCE PowerCab.
Here's an image of the track plan and a sample of the framework for the bench work:

This image of the framework just shows modules 1-3. The room does not lend itself to get a good overall shot of all of the modules but this should give one a flavor of how the modules were constructed:

The AnyRail file is attached. Thanks for taking a look.