Hi,
I've just started using this to design my next layout and it's way better than the other track designer I used before, much easier to get to grips with. I have made a list of what I think would be good additions to the software:
Track Inventory: So you can work out what you own, and what you need to buy
Cost Calculator: To work out the cost of layout or the extension you've been working on
Phases: To allow you to build up the layout in stages and see the pieces broken down per phase, so you could start with a small layout and build on that. Also tie this in with colour coding so you can see each phase clearly. Also possibly allow for hiding phases or overlapping pieces so a new phase could add a turnout etc.
Shapes: Just a couple of shapes (circle, square, triangle) instead of just having the line tool.
Just a few ideas anyway, let me know what you think!
CHRIS DORRELL
Hi
I agree, the need to draw station buildings, industrial buildings etc would be a lot easier with a "box" tool rather than using the line tool and adding points. Also a "snap to grid" option would be useful which can be switched on/off using a simple on screen button. What about a "group/ungroup" button, If I place some text inside a square and I then need to move the square I don't want to have to move the text seperately I'd rather they moved together.
David
Hi Chris and Andy,
We are actually working on a sequel to AnyRail 3, version 4.
At least a few of your wishes will be fulfilled, such as working with layers (could be used for phases), some standard shapes,, and a snap to grid option. The drawing tool is reworked completely, and has hopefully become much easier and quicker to work with.
We are currently in the Alpha testing stages. A group of users is criticizing, commenting and praising (in random order!) what we came up with so far, while we are trying to work our way to a new user interface. Of course, there are still a few hurdles, but we hope to release this new version this winter.
(Licenses bought for version 3 will be valid for this upgrade without cost.)
We've been considering a cost calculator, but it might be easier to just copy and paste the bill of materials to Excel or another spreadsheet program. The same goes a bit for an inventory system.
Grouping and ungrouping will be added in a later stage. Of course, this would make it even easier to organize your plan. By the way, you can now select the text and drawing together and move them as one. But once you click elsewhere the selection will be gone.
Please don't stop coming up with your ideas!