ivatt
Hi, first time post.
I am planning an extension to my existing layout to provide a terminus and shunting options.
I have elected to use Kato Unitrack as it avoids the need to cut holes in the baseboard for the point motors and is quickly assembled. Also, I already had Kato on my existing layout and it works well. I have however had to fit in some Peco flexi track where I haven't been able to match up the Kato sections. The only real drawback with Kato is the cost of the points.
I am attaching a couple of images showing the existing layout and where the extension will fit as well as the plan.
Basically, the extension will link with the existing at the top left hand of the layout. Currently I have a reverse loop and it is my intention to retain this for greater flexibility.
The extension is based on image of a layout I found on the web and I have modified it to suit my own needs. The biggest problem has been in trying to match up to the tracks coming in from the current layout. I have had several attempts at this and think (hope) I may have finally got it right. You will note there are several measurements on the plan, these have been put there to help in track layout.
The plan is larger than the actual space available and hopefully it will be clear to follow.
I would welcome any comments on the plan, especially the curves where the extension marries up to the existing. I run UK stock and hope that the curves will be OK for running things like the old Minitrix Britannia.
It has been a real bonus in using AnyRail as it has enabled me to move things around at will nad it has been well worth the money to buy the full version.
Thanks
Chris


BritsTukker
Greetings, Chris. Welcome to the forum.
Your layout raises several questions:
- Youve drawn a circle and labelled it 'Peco TT' - why are you not using the Peco NB-55 turntable from the track library? As it stands, you will have trouble matching the turntable directly to the Kato track - you'll need some flex in there to make it fit.
- for the two tracks next to the 'goods standing', access to the main line is difficult as the points are in the wrong direction - you'll have to shuffle back and forth to use them, which will limit the length of train you can handle.
- its not clear if you intend to use platform A or not, as you seem to have built a wall all the way along it ? ? ?
- have you thought about intended operations? EG trains arriving at platform D can only go straight back on the main line, so it appears to be reserved for EMU/DMU passenger traffic, and there's no option to switch them to another line.
I'll maybe come back with some more comments later. There are a lot of knowledgeable guys on this forum, so I hope you get some useful feedback.
ivatt
Hi, thanks for the welcome and reply.
First thing to say is that due to the constraints of the extended baseboard size and by electing to use Kato I have had to accept some truncating of the plan, likewise, my wanting to include the reverse loop imposes other compromises.
a) Peco TT, hadn't spotted that in the finescale library, have now included it but may have to reposition it slightly so it doesn't foul the incoming track. Not sure if I will have to use Peco track section to actually match up to the TT track rather than the Kato shown.
b) Goods standing. The original image I am trying to follow shows the points as on my plan which I accept will mean some shunting back and forward and limits on the length of any train. The image shows about 6 to 8 wagons on the standing.
c) Platform A, the wall is in fact a fence running along the back edge of the platform, couldn't think of how else to show this on the plan, couldn't see anything in any of the libraries. Passenger traffic will use the platform (pink track) and goods traffic will run up alongside the edge with the fence, shown in light blue on the plan. I think that section of track is used as a holding pen until the wagons can be split and shunted onto the goods standing areas, and then do the same in reverse to make up a train.
d) Platform D I need to look again at that. The original image I used didn't show any access back to the other tracks but as it stopped at approx the signal box it could be this was placed further down the track. Looking at it again, following your comments, it doesn't serve much purpose as there is no access. I will see if I can remove the point between the reverse loop and the platform track (yellow) so the point for platform is merged with platform C before the crossover from platform C so there is access between the tracks.
If that is not possible I might have to consider removing that platform completely.
One point regarding Kato points. Is it necessary to always use 20030 or is it possible to connect straight to the spurs of the points as I have shown.
Thanks
Chris
ivatt
I have made some alterations to my original plan.
As before, any comments or alterations very welcome.
Chris
BritsTukker
That looks like a better solution, Chris.
Myself I work in HO and have never used Kato track, so I can't answer your question about the points.
I still don't like the access to the goods yard: I personally would replace the 20160 curve on the purple line above the goods shed with a right turnout and connect it to the light blue track below the signal box by changing the 20220 left turnout into a double slip (I don't think Kato actually make a double slip, but there's one in the Peco library). Like I say - this is a personal opinion: you obviously please yourself.
I see there are two places where the tracks don't connect, so you'll have to do some fiddling.
Keep up the good work but most of all enjoy yourself.
ivatt
Thanks again for the comments, will look at your suggestions. I have checked that Kato do have a double slip-20210(WX310) and it's in the track library.
I'm still getting used to AnyRail and had a suspicion that some track hadn't connected properly but wasn't 100% certain despite enlarging the scale for a better view. How can I be sure when checking, is it the 2 symbols at the track ends that need to align?
If you have time and could indicate where you think this has happened , or even amend the plan and post back, it would be a great help.
I think there may also be issues some of the curves on the Peco flexitrack as there a couple of places I have noticed there is a red line in the middle of the Peco section which I think indicates a problem but despite fiddling about haven't been able to eliminate it, mainly this is where it connects to the Kato so suspect it's the angle where the 2 tracks meet that's not right.
I am also a little concerned as to whether using the 20240 point where the boards meet is the best idea. It makes the alignment of the reverse loop curve better but wonder if some of my locos , like the Minitrix Britannia might not like it.
[size=12pt]Perhaps someone familiar with Kato could advise on that and the other issue I raised with the 20030 section ???[/size]
Chris
BritsTukker
20210 is in the track library as a double crossover, not a double slip, and I expect David got it right.
The red line on the flex means the curve is tighter than the minimum radius you've set.
Do you have a 20240 you could actually test your loco on?
I'll have a go at the track plan and come back later.
BritsTukker
Well, I had a go at it and now I know why many people on this forum moan about Kato Unitrack. I won't try it again!
I've cheated and used flex in several places and I haven't cleared out all the 'too tight' bends, but it all joins up.....
See what you think.....
BritsTukker
Forgot to add on the last post:
There were two places on the layout where you used a length of flex almost tied in a knot.
I've removed one of them - the second is still there, where you've got a flex length of about 220mm to fill a gap of 71mm. Don't know how you managed this!
ivatt
Thanks for the replies and apologies for the delay responding, been a busy time.
The flexitrack knots is something I have noticed before when trying to shorten a length to fit gap, thought I had removed all the offending sections.
Your idea of using the Peco double slip is clearly the best option, it certainly makes the appearance more "prototypical" but having looked at things I have had to reluctantly decide that it would probably not be practical for me to use it
Have been playing around with the plan and think I have come up with a suitable solution but the high cost of the Kato points is now making me look at at a couple of alternative plans where the points cost isn't so much.
I agree with your comments about Kato. It has the advantage of being easy to use, once you have the plan right, and the points especially are so simple to connect. It doesn't look prototypical and getting all the pieces to match up when using anything other than a basic design is a real pain. Some cosmetic treatment does make it better but it's clearly not for the purist.
I take my hat off to all those modellers who are able to make their own track, and especially points, so as to produce, as far as possible, a mirror of the real world with all the flowing curves etc. I have never been able to do that unfortunately.
Thanks for all your help.
Chris
peartree
I don't know what kind of monetary or other commitment you've made to Kato, but perhaps you should consider bailing out and selling what pieces you have. At least consider it. Kato is fine for some applications, as those of us experienced people have proven, but anything more than a fairly simple layout is a finicky thing to design using nothing but Kato track.
ivatt
Thanks Jeff, as I said in my previous post I too have realised the problems of using Kato on a more complex layout, unfortunately lack of mobility in being able to clamber around underneath baseboards now was one of the chief factors in deciding to use Kato, especially when it came to the points.
I haven't really invested too heavily in Kato as much of the track I have was what I obtained when I set up the original reverse loop.
Finding a less complex design i.e less points, is now the order of the day, if I can't find something suitable then I may have to abandon my extension plans.
peartree
Please keep in mind that there are people here who are ready and willing to help with any redesigning you find necessary. Personally, I think that there are tried and true alternatives to creeping about sub-baseboard, such as sectioning the layout into 2x4 foot modules. We have found very few problems (besides lack of money) that can't be dealt with.
Mike from CT
ivatt wrote
Thanks Jeff, as I said in my previous post I too have realised the problems of using Kato on a more complex layout, unfortunately lack of mobility in being able to clamber around underneath baseboards now was one of the chief factors in deciding to use Kato, especially when it came to the points.
My layout (the section that I've built, at any rate) is built in three module each 2 ft x 8 ft. I did the under layout wiring with the modules on their sides, held up on saw horses. It was soooo much easier. I'm lazy. Not only could I trace the wires without scooting around, I could do it sitting down.... :)
I used suitcase connectors wherever possible, so there wasn't a lot of soldering on the underside, but there was some (mostly on the Tortoise machines) and I didn't have to worry about solder drips, either.
BritsTukker
@Mike: 'scuse my ignorance - what do you mean by 'suitcase connectors' ?
Mike from CT
BritsTukker wrote
@Mike: 'scuse my ignorance - what do you mean by 'suitcase connectors' ?
No 'scuse necessary.
They're the conveyer belts that move checked baggage from one plane to the next, when you have to change flights.... ::) :)
Okay, they're actually electrical connectors for splicing a junction that look (and fasten) like the below....


ivatt
Thanks for the replies, much appreciated. I should have made clear that there are other health reasons influencing my choice of Kato, which I won't go into here.
I have been looking again at the reverse loop. On the main board trains running in an anti-clockwise direction leave the board travel around the loop and come back running in a clockwise direction, all very simple, it just gave a bit more running track. However, once running in a clockwise direction there is no way to reverse that.
On reflection therefore I feel the reverse loop may not be such a priority as I first thought as it reduces the length of the extension board and make alignment of the track a bit more difficult. If I have a terminus I can, in theory, bring trains back to the main board onto the anti-clockwise track and by doing some bidirectional running for a short time switch them to clockwise. Thus achieving the same result as the reverse loop.
Suitable storage and shunting options will give more options for train movement.
I have been looking through my collection of old Railway Modellers, going back to 1986, and the thing that is clear is that there are no small terminus layouts from which to draw inspiration. There are some very large multi track main line stations and some small GWR or Welsh Railway layouts but that's all. In the main the layouts featured are through station.
Will look again at my plan and see if it can be modified or whether there is something else that I can use.
Unfortunately cost is a factor that I cannot ignore and at the end of the day this may decide which way I go, or even if I should abandon the whole idea.
peartree
Sorry to hear about health. issues. There's far too little good health around. Don't give up on Kato- we're not telling you it can't be, simply that it's not as easy asit would be with other track systems.