Geoff wrote
With the choice of different #'s for turnouts ,#4 #5 #6 #8, what is the general use of each type. Does one work better in yards?
Generally, the minimum recommended for reliable yard operations are #6. Larger turnouts are for high speed mainlines, smaller for tight industrial areas. But that's for modern North American equipment. Older railroads with shorter equipment (cars and locos) and specialty lines like logging railroads can certainly use tighter radii and lower numbered frogs.
Given you're here in the States, here's a more complete list of recommendations by the NMRA:
On manual v remote switches, my own guess (and that's all it is) is that it's a matter of cost and preference. Manual is a lot cheaper and, if current is carried to the frog through the points, and the inner track is insulated beyond the frog, you only occassionally need to worry about any special wiring.
On the other hand, especially in larger club layouts where there's a dispatcher, or where you want route signalling, you have to have remote control.
Another issue is how much "hands on" operation you want in the first place. My own opinion is that less is better - I'm less likely to knock some piece of scenery askew the less often I have to reach into the layout.
Then there are the mix and match folks. Again, when turnouts aren't going to be readily visible (e.g., in a cut in a hill or behind a building), not only won't you be able to reach them, you certainly won't be able to tell which way they are pointng as the Lakeshore LImited comes barreling down the main, so even the manual operations fans may have some switches operated remotely.