In my experience, the number of joins is hardly noticeable. The best thing is to wire your track every few meters, and not rely on the track itself too much to reach the far ends of your layout.
My own H0 layout is completely computer controlled, so I need occupancy detection every few meters. This means that I needed to wire the track on a lot of places anyway, and that I needed to cut flex track that was already in place to put the isolations in.
On my layout, the maximum length of a section is maybe 5 meters. In such cases, I feed it in two places about two meters apart. Occupancy detection sections are about 30 cm.
Many people lay cables all around their layout, and feed the track and other equipment from there. Soldering the wires to the track is usually a simple chore.
Personally, I have three main cables that run all around the layout: Brown for mass, Red for 'DCC current', Yellow for 'Ordinary current' to throw switches etc. So the track is connected to Red/Brown (with sometimes an occupancy detector in it), and all switches are connected to Red/Brown for the decoder, and Yellow/Brown for the switch engine.
I really should take a few more recent pictures, but maybe
this picture shows the general idea.
Hope this helps a bit.
David.