The incremental DB.
The biggest difference: a staging yard at the lowest level the lowest level (0). Four lay-over tracks and a through track. Two branchlines connect to the sceniced level (+5.5"). A double tracked loop goes around the backdrop (the brown line down the center), town scenery on the right; country scenery on the left. The station is the junction where the two branchlines connect. Operation: Start in either direction from staging to get to the junction; run around the double track oval, then get back to staging via the other branch line. The two branches together with the tracks through the station are one loop. The double track is the other loop.
Now the engine facilities have a real function. If a branchline train terminates at the junction the engine needs to be turned to head back on the same branch (applies to either branch). Those trains will also drop off cars - passenger and freight - that need to be forwarded.
A lot more hands on action. ;)
