Mauricio sent me a few extra tidbits; e.g. the era is WW2 somewhere in Germany. That certainly changes the perspective! :o
The attached is based on the original footprint, but the rest is all revamped.
The red track is a junction, to the left the line splits, both lines are going down grade. One line has a stub siding to load the gravel that comes out of the lake.
The reason for the engine facilities? The steep line on the right (
Orange) requires helper engines on every train, which are stationed here. One could also assign helpers on the mainline which is either a simple oval or a return loop under the "mountain". Each variation has a siding in order to hold a train. The counter part to the hidden return loop is the return loop up on the mountain. Which will not only require the extra helper but also allows returning to the original travel direction. What's up on the mountain? Enough sidings to keep the crew busy sorting out all the freight cars and not get in the way of the local passenger service.
Last but not least: enough space to have some believable scenery and enough room for structures. Not to mention a lot less confusion as to which turnouts need to be thrown at the last instance to end up where one intends to go. ;) :)
