Mike from CT wrote
You did - and, boy, is it.... :)
But, as someone who never saw a 1:1 scale site he couldn't free lance with abandon[sup]1[/sup], I have a different pet peeve (and not just with you - I see it continuously....)
Oh Mike..... you really did not look deep enough into my soul.... The whole idea of calling this, mind you temporary, lay-out Huntington Yard is quite simple. You can run the following equipment and not be out in LaLaLand: CP, CN, BC Rail, Southern Railway of BC (formerly BC Hydro), BNSF, UP, as well as all kinds of exotic paint-schemes... Most of these RRs are already in my son's treasure chest...
You know the Atlas grain silo in the bottom right? .....The good news is you can rotate the grain elevator 180 degrees and get rid of the switchback that, it seems to me, leaves a stub that is too short for loco and hopper, anyway.
Yes you are correct,
if we would use the Atlas grain-silo. I used that symbol, because
it just was . Most likely there will be something similar, but kit bashed, in that spot. But, yes that switchback is not optimal and will have to go.... You know, sometimes empty layout space leads to temptation....
So, if the consortium of here assembled gurus could look not so much at the faithful rendering of the realistic track-arrangements, but point me to any obvious and not so obvious booboos, concerning RR dos and don'ts in the plan, I would be grateful. The switchback was one of those ....