Getting things squeezed, shifted and moved is a bit of a challenge. But when it's done there is at least a bit of room for structures in Yakima. Building the trains and storing the incoming cars will still be a lot of work, I would have prefered to switch from the North end, but railroads (usually) don't switch using a tunnel as the drill track.
By using the siding and the Interchange track for temp storage and a switch lead allows you to move part of the train into the arrival track and push the cars to the yard tracks. If you designate specific tracks for specific towns/industries along the PCry the stub end tracks.
Any additional industrial tracks at Yakima I would assign to NP territory - similar to what I did with the team track.
You'll need to check the track components, I freely substituted from other mfgs if it served the purpose i.e. saved space.
Another item to check: normal size structures are a bit large than what you had in there and the roads are wider, too.
