Marty,
Here's an alternative approach that makes history (for me -it's the first time I didn't try to wheedle any extra space or stack up more layers than IHOP stacks pancakes....
I did swap the workroom entrance (I hope that hasn't been framed, yet) to provide aisle space, however.
About the plan so far. Basically it's a double track loop - operates the same as your plan, except I added some hidden staging tracks, so you can have six trains built and ready to run and pick the ones you feel like watching. That makes the left side a bit crowded, but it'll work if you scenic as two competing lines running through a canyon on either side of a creek (or push them together and let Gary eat his hearft out, seeing a section that looks like a four track main. ;)
Operationally, it uses 24" minimum radius curves everywhere but on the balloon in the lower right (it uses 18" minimums there.) You mentioned having a Challenger and, while it will theoretically navigate a 10" curve, I can't imagine wanting to see it going around one.
There's plenty more to do - the yard and engine terminal and I'd install reversing loops, for when you get tired of seeing the same side of the same train and never seeing the other side. Also, any industries you want and some cosemtic changes to break up the straights an 90 degree corners. I'd also do some evelating sections. If risers aren't your thing. it can be done with additional levels of foam and some of the
Woodland Scenics risers. (Id' investigate learning to build a cookie-plywood base, if you plan to use any under the layout switch machines, especially on any elevated areas.)
Anyway, I'm posting it now because I mentioned it in a PM. It is, literally, not even a finished first 1st try to duplicate what you had (the yard and intermodel terminal are missing). There will be an update or twelve with the slightest encouragement.... :)
Mike
