BritsTukker wrote
Mike, whether you use a single or double slip on a track layout, on the drawing they look the same (and you need two point-motors to operate, so the wiring layout also looks the same). It only makes a difference in the parts list, and since Fast Tracks only sells one kit in each size, it's the same part no. whether you build it as a single or double, so what do you gain from this request?
(Personally, I've never actually used a single slip - I've always found I needed a double)
(also personally, I can't afford Fast Tracks stuff).
I gain the ability to visualize which I would need to actually build. There are a number of places on my
Metropolitan Union Station where the single slip is critical, but a double slip is totally unnecessary - and the extra hex frogs would cost me a fortune.
I can't afford the Fast Track stuff, either - except that MUT would require only two jigs (#6 plain and #6 slip) and MUT uses 7 slips/crossings (if I counted correctly), so building my own is actually noticeably cheaper than buying all 7 - even if I need to buy enough rail and ties to make a dozen, just to get seven usable ones.... :)
(to David)....
BTW, the angle on the Fast Tracks N scale #6 regular turnout is off - and it makes a difference. The angle of the diverging track in Anyrail is 11.31 degrees, the actual angle is supposed to be 9.46. This is more than simple an intellectual problem when trying to align #6 slips and #6 simple switches. And I'm seriously considering building MUT using build-my-own turnouts - probably a mistake after reading a thread on nscale.net about the problems, but there are enough "simple" #6 turnouts I can start on that I should have some level proficiency before I have to tackle the slips and I'm a sucker for a challenge (and I've always been jealous of the track work of those who were proficient in building their own.... :)