Hello everyone,
Just started on this forum and I'm working on my first Semi Prototype Layout based on the industry located in Frederickson, Wa and the Shortline Tacoma Rail.
11 Inch Curves Main min, 10 for industry.
Industries are as follows.
Purple is a Boeing Wing Plant: Boxcars, Aluminum in. Emptys and Flats with wings out.
Red is Parr Lumber Company: Load bulkhead and centerbeam
Yellow is a Building Material Plant: Bulkhead flats and centerflows
Orange is a steel plant(looks like rebar to me) Loaded flats
There are a couple of tweaks I am considering still.
The track right above Parr Lumber is a double in the prototype with two track in this case heading to staging or being combined just before
Also considering Extending the Boeing siding to after the Steel plant for loading unloading reasons.
About the grade I know its high however the Mountain Division does have a 3.3% grade. Goes from 0 to a height of 2.5 inches at the top of Boeing.
Planned Power is Two GP38-2 Two Gp40M and possibly two GP22. Trains are going to be between 4-10 cars.
Let me know what you think, criticism welcome :)
-Eilelwen
