Well, a few days mulling over other people’s plans, and it was time to go back to the AR drawing board! The single-track was bothering me, and eventually, the stupidity of having half of it tunnelled dawned on me!
What I didn’t mention previously was that I have an existing layout, which was thrown together in haste (and before I discovered AR!) which has made me realise that this time round, I’m going to spend as much time as it takes to get something that feels right planned in advance. (It’s the main reason I put those constraints in place – as you may imagine, the existing layout breaks all of them! :()
I also realised that the shape I’d chosen for my first post was being influenced by the existing layout – and that using two long parallel boards connected at one end is much more sensible arrangement and use of the space.
So, re-visiting the space available, but keeping to my original constraints, I’ve come up with this...
...by nicking an extra foot from the free space (the plan now sits within the overall available space), I can have two 4-foor wide baseboards – and while that still dictates very tight radii, those are now compensated by a nice lazy curve on the higher level section.
The main station (Great Deane) has become a terminus, with goods and loco facilities (and even, BT, a couple of tracks & facilities off the turntable!). A headshunt allows trains to operate in both directions, and there is now a smaller through station which, given the small area “feels” like it’s some distance away. This has a bi-directional run-around loop with goods facilities off. From here the track rises to scenic hillside covering all of the right-hand ‘U’ of the layout, passing the brewery siding on its way. Only short tunnels cover the lower tracks.
So, Jeff, you were right – much better to get it planned here, and [tt]always an alternative[/tt]! :) And whilst N-gauge would, no doubt, make a much better use of the space, I have too much investment in OO stock to warrant changing now!
As before, all scenery is
purely representational, etc, etc.
Once again, constructive suggestions welcome. (He-he, and maybe even destructive ones - after all,
I did tear it up and start again :D ;D)
