Capt. Brigg
Here is my newly revised track plan for my PC Ry. I have the benchwork built and am ready to lay down plywood. Any suggestions for improving or correcting problems in the track work will be considered and appreciated. :)
glakedylan
greetings Capt.
at first glance there is alot of track!
so much track is creating some issue that may come into play
namely (1) S curves, and (2) your incline at 4%
if you are planning only the run short trains with short cars
that have truck mounted couplers you might get away with the
S curves keeping minimum of 24" radius that your plan notes.
really short trains will handle a 4% incline but will you be OK
with this limitation especially as time goes on?
thanks for posting and sharing!
Gary L Lake Dillensnyder
Capt. Brigg
Since I have a relatively small area I will be running shorter trains. This is a mountain bridge line across the Cascades between the NP in Yakima and GN in Chehalis, so short trains with helpers are expected. The original CC&C on which this is sort of based, was a logging line with lots of curves. I enjoy switching, making and breaking trains, so have tried for two medium sized yards with some connected main and sidings. The main is a figure eight folded in on itself with the gantlet lift out bridge cross over.
Thanks for your feedback. I will give your points a second look.
peartree
Given your limited space, I don't think you can do much more. I have to agree that there is a lot of track, but if that's what you want, then go for it. The issue I can see is in the bottom right corner- your track clearances are under 4". And not just a teensy bit under, I mean FAR under. That's going to cause trouble no matter what kind of trains you're running.
Also, click on the Line that makes up your mountains. Now look at the tool Ribbon up top of the page. Now click on either Curved or Round and look at the mountain. Much better, eh?
Capt. Brigg
Well, I've made a bunch of changes, mostly from suggestions from MR and just trying to take out some of the S curves. Remember that much of the track in the north end is hidden. Essentially now the layout will run point to point with NP, GN and Milwaukee coming out of staging into town to drop off cars and out again. PC Ry will make up a local and go from west to east or the other way.
Still looking for ideas.
andywsr
I have just viewed your plan, i can only say its awesome and I wish I had the space to build something as good and interesting as yours.
peartree
Capt. B- I only have a couple of small comments. First, the Yakima Power building seems to have wandered a bit off intended target, winding up on top of some track. I'm fairly sure that would interrupt distribution and annoy customers (not to mention the workers in that building).
Second, I'm having a hard time figuring out where the green NP Main goes when it drops out of sight.
RhB_HJ
Jeff wrote
...............
Second, I'm having a hard time figuring out where the green NP Main goes when it drops out of sight.
Hey Jeff,
if you turn off the upper sidings layer it will be clear as day!
That's what layers are intended for, aren't they? :P ;D ;D
PS I think it is a very nifty plan with a lot of action. The only fly in the ointment - just my opinion - is the short loads/empties tracks between Yakima PS and the Coal Creek mine.
Capt. Brigg
Ahoy all;
Thanks for all the input.
I've made several significant changes,
getting rid of several S curves, moving track around to link things up.
Since I take great pleasure in hand laying my rail and turnouts, several of the tight places will loosen up with turnouts that have points closer to a previous frog. Thinking about it now, it might be nice to be able to draw your own turnouts and import them. I love complex well laid track work and will be running trains over the layout for many months before covering hidden track. Even then hidden track will be accessible from under the layout or by removing sections of the foam built mountain. I may start out with switches at the ends of the bridge, until I can build a well designed gantlet crossover. Attached is the latest update to the track plan.
peartree
Well, Cpt., gantlet bridges aren't anywhere near as complicated as a pair of turnouts. Especially since they have no moving parts. I've attached a simple diagram of a gantlet track section so that you can see what I mean.
p.s. Glad to have another real sailor aboard :)

Capt. Brigg
Jeff, thanks for the picture:
The gantlet becomes a little more complicated when it is also a crossover, like going in on the south side and coming out on the north side, with four frogs. However the real complicated part is in scheduling trains across the section without running them into each other. The other complicated part, on my layout, will be that it all will be on a swing bridge and need stopping blocks at both ends and power to the bridge. It's all in my head, I just need to get it into reality.
By the way, I teach sailing on the Columbia River and deliver vessels along the Pacific coast, but was in the Air Force, not the Navy. My dad was a sailor and I was born in Rhode Island, that's as close as I get.
Capt. Brigg
peartree
Well, I spent 5 years sailing and maintaining a 36 foot wooden river ferry sloop. I could have gone for a commercial maritime cert at that point, but was too busy keeping the darn thing afloat :). As for the train chaser part, I plead guilty...
Ok, I see what you're talking about, but I have to warn you: the real railroads would never have made something like that. Much better to put the crossover at one end of the bridge.
Capt. Brigg
Jeff,
With a crossover and then the gantlet, I would be worried about a pretty "snarlie" S curve and six frogs. As it is I will have three frogs at one end and one at the other and hopefully avoid the S curves and make it just a very long crossover. I will most likely start the bridge with switches at both ends until I get the gantlet built. I just want to avoid having a short cut, at the front, between yards. There is already one at the hidden north end.
peartree
Ok, but I don't have to like it :). BTW, when you go to put in the two turnouts, make them 'Y' turnouts. That way you won't have much track reshaping to do.
Update: Uh-oh! It looks like you've got some redesign to do since the gantlet track requires you to have two parallel tracks on the bridge approach. Your current tracks 'merge' much before the bridge, which is definitely NOT prototype in any picture I ever saw. I'll give a try at designing you something that might work...
Note that the track arrangement at the left side is really much closer to what you'll see in a real gantlet. You're going to have to do some heavy nudging to get that parallel arrangement on both sides, but that's the breaks. Like I said, I think you'd be better off putting the crossover off one end... probably the left since there's a teensy bit more room to wiggle... and make it a crossover where the legs curve through the crossover.

Mike from CT
Jeff wrote
Ok, I see what you're talking about, but I have to warn you: the real railroads would never have made something like that. Much better to put the crossover at one end of the bridge.
Jeff,
One thing I've learned is to never say "never" when it comes to what railroads would or wouldn't do. :)
My only question would be the engineering on the actual crossing pair (the middle two, paired frogs) where there's precious little space to develop any frog angle that wouldn't be so shallow as to be too easily picked, even in 1:1 scale. Maybe a single track with spring-loaded switches (in model railroading, using auto-detecting circuits leading to the switches to avoid shorts) would be a better solution?
RhB_HJ
Why do it the complicated way? Use turnouts at either side of the bridge and treat the bridge section like any other interlocking to be used by either one or the other line. Since the whole works also swivels (rotates) there is nothing gained by having a gantlet track.
How would the proto (most likely) handle it?
Either build a separate bridge (they have their pride ::) ::)) or swallow their pride and one allows the other running rights.
BritsTukker
H-J, I think you're missing the point: the Captain likes scratch-building novel track configurations. Two turnouts might solve the problem easily, but as Jeff said, gantlets don't have moving parts so don't need switching. Ganlets exist on a few railways (q.v. the Perry Island bridge in Quebec), although are more used on tramways. It would certainly create a talking point.
I wish him success - hope eventually to see pictures of the system working.
peartree
I, too wish him many happy hours working on the layout. There are MANY examples of gantlet track, including gantlet used through tunnels(!). I grew up near one- the now-gone Poughkeepsie, New York railroad bridge of the New Haven that crosses two New York Central main lines and the half-mile-wide Hudson river; for many years the highest (65 meters) railroad bridge in the world and among the longest, at 6768 feet. That bridge was changed from 2 track to a gantlet when motive power in the form of diesels got too big and heavy for the bridge. The bridge hasn't been torn down, but is now a state park pedestrian and cycling space. Since it's a solid fixed-span bridge, there are no piers or towers extending above the roadbed and I can only guess that crossing it in a blinding snowstorm (of which there is at least one per winter) must have been something to make an engineer just a bit nervous. The river is somewhat over 200 feet deep at that point and there's nothing between your train and bottom but a lot of air.
RhB_HJ
Oh I got the point, no problem there.
I just approach it from the engineering perspective (real railroads): the most elegant solution is the one that requires the least extra work/money to get the same result. ;) ;)
BritsTukker
@H-J: If from the 'engineering perspective' real railroads sometimes use these things, they must have a good reason to do so....???