PaulB
Hi All,
Been busy with work and thinking about space and budget and have changed my plans a bit. Basically, it is a 14' by 13' L with Bubbles on the ends.
I have been studying easements and reworked the plan to include them everywhere.
This first phase is just the double main and two reversing loops, I will add yards & industries etc in later. While nothing is set in stone, I am going to order the track next month and buy the lumber for the benchwork ( L Girder and Cookie Cutter). I will not be doing the 2" foam routine just going with 3/8"s plywood. I have not finalized my decision between cork and foam roadbed but will prior to ordering the track. I am awaiting delivery of a DigiTrax Super Empire builder.
Paul

peartree
I think you have a budding problem. Where the psuedo-helix crosses over itself at bottom right, the clearance is much less than 2". This is going to be an issue and I think it will become an instant reason to redesign that spot.
Then a question- on each side of the loop are a 4+ and 3+ inch pieces of flex. Surely you can combine those into 1 piece in each spot? Come to that, there seems to be a virtual mob of little bits of flex track all over the layout. Unless you really get off on soldering rail ends (and you're really good at it) you are going to create more joint problems than you do away with.
And then there's that length of flex along the top of the layout. It doesn't connect to anything else. Is it a 'Display track'?
RhB_HJ
Jeff wrote
.............
Then a question- on each side of the loop are a 4+ and 3+ inch pieces of flex. Surely you can combine those into 1 piece in each spot? Come to that, there seems to be a virtual mob of little bits of flex track all over the layout. Unless you really get off on soldering rail ends (and you're really good at it) you are going to create more joint problems than you do away with.
And then there's that length of flex along the top of the layout. It doesn't connect to anything else. Is it a 'Display track'?
Paul wrote
I have been studying easements and reworked the plan to include them everywhere.
If you'd check you'd find out that's what they are. Each easement is a separate piece, that's how it works in AR.
Increase the grade in the spiral to 2.3% and there will be enough clearance, as per attached.
PaulB
Jeff,
Yes, the easements make it look like a lot of small pieces but I will be running 36" segments of Peco 55. I figure I will be printing the easement segments as templates for aligning the track. Should be fun!!
And yes, the top track is for 'display'. I will probably set up a short train (maybe a trolley) to run back and forth on some type of automatic schedule.
Hans,
Thanks for noticing that ovesight :), I will set the height at that crossover to 3" and that will change the slope to 2.2%.
Paul
peartree
I did notice that about the easements, but the sections are so short that it's hard to tell... AR doesn't tag track for that usage. Also, I don't think foam holds nails well under continued use. It's a shame, since foam is so easy to cut and shape.
PaulB
Jeff,
While I am not sure about how well the thick foam holds nails, I just don't see why I would use it. Plywood and cork (foam) roadbed is the way I am going and that will hold the nails very well.
I do wish that AR would visually tag easements as it does curves. I do believe that prior to the current release of AR, it did not even remember that it is an easement.
Paul
RhB_HJ
Paul,
Yes, it did remember that it is an easement, however having to disconnect the piece to find out is certainly not handy. If I remember correctly it seems to loose the memory if you copy/paste easement sections. But I have to try that again to be sure.
It also does that when one cuts flex curves e.g. perfectly circular flex curves, not the variety that one bends to fit (free flow) where calculating the new data would be very tricky.
But as with several other items I have found my own work-around to come up with what I need. ::) ;)
peartree
Paul,
Yeah, easements are something that will probably be kicked around and resolved before AR hits version 6. There is a longish list of things that need to be smacked around a bit before they fit right.
Don't confine yourself to cork OR plywood. The usual is a plywood subroadbed and cork roadbed. Of course if the cork or foam is thin enough, the nails go right through to the plywood. The only issue you have to decide is how much noise it generates when done that way.
RhB_HJ
As far as I know, track can be fastened with a bead of silicon caulking and once the ballast is applied and glued the track stays in place. HOWEVER the glued ballast will also transfer some of the running noise.
@ Jeff
ver6? I haven't seen ver5 yet and I'm looking forward to plenty of additional, highly functional goodies. ;) :)
PS make that clear silicon caulking!
peartree
Yes! With my patented crystal ball I predict that easing easements won't happen until we're headed at ver 6. ;D
RhB_HJ
Jeff wrote
Yes! With my patented crystal ball I predict that easing easements won't happen until we're headed at ver 6. ;D
Say what? You mean you clean that crystal ball more often than your glasses? :o :o :P
peartree
"Say what? You mean you clean the crystal ball more often than your glasses? "
It doesn't require cleaning! See page 17, paragraph 4 of the patent :) After all, it's magic... ;D
RhB_HJ
Ahhhhhhhhhh quite similar to the anti-gravity ties!
PaulB
Hi All,
Been planning, pricing and buying!
Bought a Kato Morning Daylight with the ALCO PA1 & PB1 and a DigiTrax Super Empire Builder (wireless) back in May and this month I bought the Peco track & switches, cork and all of the lumber. Tonight I will work out the cut order for L-Girders, legs and cross beams and then tomorrow I will pull out the bench saw and have at it. In July, I will buy the Tortoises, Wabbits and assorted other electronics. I expect to be laying track by early July!!
I did set the 4x6 sheet of plywood on saw horses and laid a two line main with a pair of right hand switches to connect the two tracks. I did this to practice creating the curves and easements and soldering the track.
I do not like how slow the Morning Daylight needs to switch tracks so in my plan I increased the spacing between the tracks from 1 1/2" to 2 11/16" but have not tested it out yet.
I made some additional changes to the layout but have not yet started to think about spurs and industries ..
Paul

glakedylan
greetings Paul
you note the speed element in the dynamic of PA ALCO crossing turnouts from one mainline track to another and need to increase the center to center spacing.
speed is so relative...what kind of throttle setting are you using? it would not seem problematic for a PA PB ALCO to have any trouble on #6 or greater turnouts with center to center distance of 1.25".
i am wondering what speed you are expecting/using that would necessitate such a wide distance between tracks?
thanks and best wishes
respectfully
Gary L Lake Dillensnyder
peartree
Hmm. Well, the Alco P-series engines are fairly long and if the ones you bought have body mounted couplers you could have to slow down some. However, I think that over 2 1/2 inches is way too big a spacing. Consider slowing down some. Real railroads use huge frog numbers to handle high speeds and nothing in standard track systems comes close, so grin and bear it!
PaulB
Gary & Jeff,
Good points.
It is the 10 passenger cars that give me a problem changing tracks. I can live with how it looks snaking thru the turnouts but not the derailing. So this morning I studied my track work a little closer and lo and behold, improvements are needed. Of course this is exactly why I set up this board - To Practice and Practice and Practice .. So I will redo this section and see how it goes before committing to the the track to track centering.
Gary,
The speed setting of 14 is the maximum I can run without derailing the articulated passenger car. I am pulling the full 10 cars of the set (need to order the other 8 at some point). My goal is actually to determine the limitations and to take actions to increase the limitations (where appropriate).
Paul
RhB_HJ
Paul,
While you're doing improvements, check all the wheel sets of the cars.
This is apart from eliminating as many S reveres curves as possible. ;) ;) :D
peartree
@PaulB- When you order up the other 8 cars, you can put in the order for the 20x50 foot room you're going to need to run 18-car passenger trains (not counting the 2 or 3 engines in the set). :D
@HJ- What's your favorite tool for gauging wheelsets?
RhB_HJ
Paul,
Here are a few of those S curves eliminated, I highlighted the track in
red.