Skorpyo
Hello,
I'm getting started with model railroading and I'm planning a layout I intend to build over some time with my son so please be gentle. I've acquired a fair bit of track and trains from Craigslist and the like and have built a 4x8 table to start with.
I know a lot of people turn their noses up at a 4x8, but it's what I have room for. I've purchased Anyrail and have been basing my design off one posted in
another thread here.
My issue is I've tried a few ways to get enough of a run to allow a 2.5-3 degree grade to allow the over-under pass but can't get it to work. The section of track in yellow is the section that will pass over and I've assumed a 3" clearance at the crossing.
So question is: Can this be done and am I starting with too challenging a layout?
I am an avid craftsman so building the layout doesn't scare me, nor does the wiring (electrical engineering major) but the civil portion is slight challenge. Thank you in advance for any advice.
I've attached my layout (big credit to glakedylan).
Skorpyo

RhB_HJ
Welcome to AR,
Attached is your plan with the elevations and the resulting grades: 3.9% and 3.2% ..... but there are alternatives. ;) :)
Skorpyo
Thanks for the prompt response! I ran into the same grades when i tried it out and from what research I've done anything over 2.5-3 degrees is a good way to burn-out enginees and derail on downhills. I suppose I should reconsider my layout since I'd hate to invest years of effort into an unusable layout...
Thanks!
peartree
Skorpyo,
I suggest you set up a small section of track on the grade you need to use and see if it works to your satisfaction. Nothing permanent, just a trial section. If all else fails and the 4x8 is all you can spare, consider switching to N scale. You can get most of anything available in HO and in effect it really expands the room and eases grades. And finally, 3" is a very tight vertical clearance in HO scale. If that's the best that your grade allows, it makes another reason to change scale or change the layout.
chaz
Skorpyo,
Your design is called a double track, folded dog-bone. One of the twice around layout types. You have to get really creative if you add the crossings....as you have discovered.
A few months ago, I was working with a friend who had the same goals in Z scale and this is what we came up with. Unfortunately, it don't think it will scale up to HO on a 4x8 piece of plywood.
I call your attention to the knot of switches and crossings in the middle that we call "Suicide Junction". This is where trains can change from red to blue and from blue to red without reversing loops.
There are 5 industrial areas, labeled A thru E. If the dispatcher is grumpy, he will direct you to switch the industries in alphabetical order. It takes a lot of trips around the layout. Start by leaving the yard on the blue track to the left. End by returning to the yard on the blue track from the right. Something kids like to do...even if they don't actually switch the industries.
Chaz

peartree
@chaz- have you considered replacing some of those crossings with double-slip switches? Or aren't they available in Z?
@Skorpy- I've tried relaying the entire thing to allow for better grades, but it won't fit in a 4x8. I've seen a better layout that does what you want, but it was 5x10 [see the Atlas 'Six Layouts...' book]. Even if you can make it fit, you will be very limited in the length of rolling stock you can run.
BritsTukker
Skorpyo,
Welcome to the forum!
The problem with HO (which I also use) is that you need much longer lengths to achieve reasonable gradients. You need 100" track length to keep below 3%, and it doesn't fit well on a 4x8' panel. As you have it, the board is pretty full of track, so I don't know if you want to add scenery, industry and the like, but you don't have mucj room for it. All your sidings and the passing loop are pretty short, so you won't be able to run anything approaching a normal length train, and as Chaz has said you're in for some interesting operational situations with those crossings.
The most important question is do you have any more space you can use?
Cheers.
glakedylan
Skorpyo wrote
So question is: Can this be done and am I starting with too challenging a layout?
Skorpyo
greetings Skorpyo!
i am humbled that you would choose a trackplan i designed, but then when it was originally posted, i also noted it was a plan altered from an Atlas N scale trackplan book. so I cannot claim that the original is mine.
nonetheless, as it was from an N Scale book and designed as altered by me for an N Scale layout, i do not fathom how you would make it work in HO Scale unless you were willing to go to near 4 degree inclines, which would mean very short trains...but then in HO on a 4x8 short trains are probably a must.
the original plan showed how to cut a 4x8 to make a 4x12...so to begin with you would have to expand to the 4x12 dimensions...is that possible?
here is how it is done:
best wishes w/ your MR
Gary
chaz
@Jeff,
Dobule slips would be better, but Rokuhan doesn't have any yet and it had to be 100% Rokuhan design. Z scale makes me cross-eyed. In addition, I think double slips would create the need for reversing loops.
@ Skorpio,
Lets see what it takes to get a 2.5% slope with a 4" clearance. A 2.5% grade takes 160 inches (13-1/3 feet) of run to reach 4" of height. Since the crossing tracks want to be somewhere in the middle of the layout, I suggest that you have two alternatives.
First, place the overpass directly over the crossing tracks in the middle of the layout...which is what I did. Somehow, you will have to create grades to and from the overpass that are 160 inches long.
Second, split the slope into two halves. That is, set the height of the crossing tracks to the midpoint or 2". The low track has to dive 2" and the high track has to climb 2". Since we are splitting the slope in half, each of these grades has to only be 80 inches (6-2/3 feet) long. In this case, you want the crossing tracks and the overpass to be far apart. If you move the crossing tracks as far to the lower right as possible and move the overpass as far to the upper left as possible, you may have a chance.
Chaz
PS Thanks for a good problem to think about.
peartree
I think the whole thing becomes a little less hard if you use a single track main, but any way you cut it, it's going to be tough grades.
Skorpyo
Hey all,
Thank you everyone for the warm welcome and great feedback. To be honest I built the 4x8 from some plywood I had laying around and while the boss (wife) was outta town. I set it up in the basement and while she's very supportive I could tell she wasn't pleased we had to rearrange the furniture. To be honest a few flowers and boxes of chocolate may earn me some extra space so I'll have to look and see how I can work that. Really the basement is unused and is somewhere around 900sqft so I can probably steal some more real estate
I would love a layout that would allow me to run an operational line quickly and then expand so I'm going to take the feedback and see how I can figure that out. Maybe start with the 4x8 area for some industry runs and maybe a loop with potential for a raised level to my expansion. I'm considering adding a 3x8 addition that would give me an L shape with an 11x4 and 3x4. Maybe I'll buy some jewelry and make it bigger lol.
I'd like to have a setup with at least one continuous loop and industries to play in. I have 4 controllers, three of which are really nice and maybe 12 engines (of which I am repairing 5). I have a lot of flextrack and quite a bit of steel track sections but I'm going to have to pickup more switches. Since pretty much everything I have track wise is atlas or bachmann I've stuck with that so far. I'm not overly impressed with some of the crossing atlas offers so I've added in some peco pieces.
Ok, enough rambling. I'll see if I can put together a new layout and use layers for stages of build. I do want space for buildings and scenery since models were a childhood hobby I still love.
Thanks all!
Tim aka "Skorpyo"
glakedylan
Jeff wrote
I think the whole thing becomes a little less hard if you use a single track main, but any way you cut it, it's going to be tough grades.
the original was a single main w/ a few places for passing parellel track
i added the continuous 2nd mainline, as it was easy so to do in N Scale with Atlas turnouts being equal in angle and length to their 18R curved sections. of course the double mainline called for double the amount of crossings.
if the track gets soldered together and one uses those Atlas pier risers it could possibly work...not sure, but it might, but then very short trains and not very prototypical in look for the raised sections. but, then, the same pier risers in N Scale is what the original plan called for. i was going to use woodland scenics styrofoam risers as it was worked to a 2% incline and smoothly so in N Scale.
did not build the plan as i decided i would get bored with it much too quickly really wanting to run longer trains and provide a passenger terminal along with steel mill, coal mining, and an urban center.
if the layout was something to begin w/ and have shared experience in building and running w/ son, it may just be worth it...but i would make sure the grades of incline and stability of raised tracks are considered.
best regards,
Gary
peartree
Skorpyo,
I think it would be worthwhile, considering the cost of land for further expansion of your railroad ( :) ), you should investigate the possibility of something on a variable-width shelf around some of the walls. Such a layout would benefit from a place to park a return loop or two and an industrial plant provides lots of scenery that can be used to break up a view of the loops. That's a plus. Keep firmly in mind that AnyRail (AR) is a perfect tool for doodling, so having 20 versions of what might work isn't a big deal. Always start with a complete and 'accurate' picture of the basement as it exists today. Make a drawing using AR's tools and save a copy. Make copies of that floor plan to use in designing the benchwork (first) and layout. Your existing Atlas track is a pretty good choice and if you look through posted track plans you'll find a lot of people mixing in Peco turnouts, since they make items no-one else does. Once you have a benchwork plan that you're sure you can do, post it here and you'll get plenty of suggestions on track plans. Don't let that stop you from doing your own doodling!
RhB_HJ
Hmmmm,
One could of course simulate a double track line by folding the dogbone and have one end high and the other one low. then add the features which were originally all on one level. The only "troublesome" crossing that remains is used for industrial switching. It is still a bowl of spaghetti but the grades are managable i.e. the downgrade of the "double track" sections is on the inside. And two trains can spell each other off ..... or whatever.
BTW I was very surprised that there was no mention of the very, very tight curves in the original plan. Did you guys think this was N-scale???? :o :P :P
PS and now it's back to CAD drawings for still more lasered parts.

Skorpyo
RhB_HJ,
Atlas and bachmann both offer 15" radius track and I had read this was the minimum for ho. I don't plan to run very log cars so I was under the impression it would be acceptable. Should I maintain a greater distance or wider radius in your more experienced opinion? Thanks again for the insightful input and I'll try to get started on a new layout tonight if time affords. I've pretty much decided I am going to expand the bench work and afford more space in the future. Thanks again!
Tim
RhB_HJ
Tim,
For good, reliable operation I choose 18" as the absolute minimum for HO standard gauge e.g for industrial switching sections. Even for HO narrow gauge I won't go below 16" rads.
If you combine tight radii with steep grades it gets to be "very interesting".
BritsTukker
Tim,
For info, I don't use anything less than 20" radius and as far as possible I use 24" as the minimum.
peartree
HJ is, I suspect, very busy at the moment with a project he has been tied up in for some days, now, so I'll answer. The stock answer is that 18" is your minimum 'safe' radius. Almost all HO equipment will navigate that without derailing. It's not ideal, but it's usable. Now, if you have things like 4 wheel diesels or other short-wheelbase engines, they may go around 15" or smaller curves, but they will look like crap doing so and unless all your couplers are truck-mounted, you will find that other rolling stock will derail with a fair frequency. You know exactly what you'll be using and we don't, so when you go below 18" you take your chances. There are a few things you can do to make 15" more usable, but it's not a cure, simply something that helps ease a bad situation.
Skorpyo
Jeff and all,
That makes perfect sense to me. I have recently acquired a trolley engine that I'm going to setup an in-town run for as I sketch up a new layout so I'll consider that the only place a 15" radius turn might go. I can live with an 18" minimum so I appreciate the input. Thanks!
Tim
peartree
Ah! A trolley! Different story on that! When setting up a trolley, you can use these guidelines- 4 axle can use 10-12" generally speaking and 2 axle can use 8-10" radius. These cars usually run alone or in pairs and are engineered to go around turns like that.