Everheart
This is a new layout for my dream railroad. After listening to your post and doing some more homework. The Era is transition 1950's freelance. Coal and Timber Railway. I am still in the design stage and hope to come up with a good design within one year. Then start to build this layout This is my retirement project when I retire in 5 years. I like N-scale and it has come a long way from my first layout in the 80's.Would like input.
peartree
First off, welcome to the forums. Us regulars will do what we can to help you out. I took a look at your layout proposal and it seems to me that there are a number of strange track arrangements. One is that double-ended yard with one end going nowhere. All I can say about that is to ask you what you intended to do with that. And then there is that length of double track with several double crossovers along it. In that case, neither end connects to anything. All I can suppose is that you're not really finished with the design. Overall, the layout looks a lot more like a track diagram than a railroad that has to follow the contours of the land, to some extent, at least.
Let us know a little more about the railroad.
RhB_HJ
Jeff,
If you look in his pofile at the posts listed you can see the evolution of the plans. ;) :)
peartree
Yep, I saw them. I'd just asked him for a little expansion of his G&D list. And, I was giving him 'input'. Like I said, some of the track arrangements he put together are quite possibly the strangest I've seen. I want him to let us know how he came up with them and what his reasons were for their use.
RhB_HJ
Welllllll in that case you fire up that file and apply the changes that you figure would work better, are more logical and then post them in a format all of us can download. :) ;) :)
peartree
In this case (not involving any download, upload, wide load, or green toad) I didn't even worry about it. In the case of PaulB, who has some overly-rubber-stampish trackwork and only a FEW little glitches, ...well, I'm working on reworking the work in 4.23 format.
RhB_HJ
Yeah, Yeah! ;D ;D
Looking at that plan I see: L&N is the red mainline track , Norfolk is the black mainline track. Between Ashtown and Williamson the Norfolk has running rights on L&N track. Between Williamson and Westfield the L&N has trackage rights on Norfolk.
The Blue line - who serves all the customers out to Wilcox - interchanges at Westfield. The green line is the timber line.
Whole bunch of industries in the different locations, should keep people very busy and the dispatcher getting the traffic coming out of staging on his toes. I like it when two separate railroads have a bit of a bottle neck on those single track main sections.
And I have an idea to make the traffic get some balance which means even more work for the dispatcher. :o :o ;D ;D And where exactly are those loose ends you're writing about? ??? ???
PaulB
Jeff,
If I had a thin skin, I might have taken insult with the 'rubber-stampish' reference.
Unlike the fantasy layouts (i.e. this L&N) that appears to be in an unlimited space and yet is laid out in mostly straight lines anyway, I must work with limited space. I have an inclination to include the Sunnyside Passenger Yard, which is dictating a racetrack oval for half of my layout (the real Sunnyside Passenger Yard in Queens NY is very similar but does have ingress/egress on both ends that can feed the yard from all four corners).
Limited space and a need to maintain decent radii on all curves requires compromises.
As the reference to the Sunnyside Passenge Yard implies, I do plan on mostly running passenger trains and thus you will note that each long straight section has a level section for the passenger terminals. I have been meaning to ask what the maximum grade that would be acceptable at a passenger terminal is but at the same time I do understand why the grade should be 0%.
As for the areas for freight delivery/pickup, I am still studying different types of locations to determine how best to appoach this considering the constraints on size of the layout.
Looking forward to your builds on my layout
Paul
RhB_HJ
Paul,
;) That isn't a problem, Jeff just hasn't seen the potential in that upper area, yet.
Now on this L&N my first mod is to utilize that staging yard a bit more. First flip half of it, the center track becomes the run-a-round track for all motive power. Allow access from either East or West to balance the CW and CCW traffic.
RhB_HJ
Modification 2
Changes to the interchange:
There should be enough traffic coming off and going to the branch that a three track interchange yard is justified. More so since the original arrangement allowed run through i.e. by-passing Westfield. Since both west- and eastbound trains will use the interchange three tracks sounds about right. Used as the text indicates.
I also straightened out some of those tight aisles by rearranging the track alignments (just very slightly ;)). That bridge in front of the machanical room needed a bit of realignment, too. I fby any chance your water heater is in that mechanical room, I suggest you measure to make sure that there is clear passage room through that bridge gap.
What has me scratching my head is that big service facility up at Williamson, which location is this supposed to serve?
Cheers
HJ
peartree
@PaulB- You should know one thing about me by now: I have a great dislike for trackwork that duplicates more than once and tracks that are more symmetrical than called for by terrain features. They remind me in a negative way of most of the layouts I saw published in British model railway magazines in the 60's. And of the endless loops of Lionel around the Christmas tree. Please don't take my comments as a personal attack. They represent only my opinion of the design offered, measured by my particular standards for a good-looking and operationally interesting railroad. I take the goals for the layout, as laid out by the owner, and things like trains and/or track already owned as they can be applied to the new design, and turn out a design that takes all that into account, as well as possible. There has to be that caveat, since there are often conflicts in the mix. In the case of your layout, I am going to offer a few minor tweaks to the upper section and the addition of a few crossovers. I've been past the Sunnyside yard more than a couple of times and I know it pretty well.
@HJ- My third post was referring to your previous one. That was actually talking, I think, about PaulB's layout and not the one in this thread. I guess I should have been more specific, but I thought you'd figure that out.
Now, as far as THIS layout goes, what has me scratching my head is the scale of things like the staging yard (center right) and things like the scale of the yard tracks (notably at Ashtown). Here you have a very large layout, in terms of square feet and many of the track features, like passing sidings and yard tracks, reflect that by being above 10 feet long. Yet the noted tracks are more in the neighborhood of 5 feet. Also, I would modify the design of the staging yard. Having a couple of smallish tracks exiting the back end of that yard hardly seem able to hold large trains of any kind.
peartree
Another note, Everheart...
I see you used Kato Unitrack for most, if not all, turnouts in the layout, and Atlas code 80 flex track for a lot of the running track, with Kato bits and pieces and bumpers thrown in. That won't work. Kato Unitrack requires conversion track pieces at any track end that connects to anything but Kato Unitrack. As big as that layout is and as many 'mixed' track joins as there are, you're talking in the range of over 100 conversion track pieces. What you need to know about Kato Unitrack in general is that it's one of the several track systems that has plastic roadbed and ballast built onto every piece of track. Appearance-wise, Kato track only connects to Kato track. Atlas code 80 doesn't look the same nor work the same. It has no built in roadbed and lacks the track-to-track connectors that Kato has. I'm afraid you're in for a lot of re-design work on the layout.
RhB_HJ
Jeff,
All the trackage has a very strange size/purpose balance, but until I hear what the prospective builder has in mind - things like train length, traffic patterns etc. I won't really sweat it. Suffice to say that I would eliminate a few things along the mainline.
BTW useable length of the staging tracks is 2m (6.5ft) good for 20car train with carlengths averaging 55ft. Two or three additional feet would be better to get to the "magic 25 cars" number. :P ;D
RhB_HJ
Jeff wrote
........
I'm afraid you're in for a lot of re-design work on the layout.
Let's just hope it will be Atlas turnouts instead of Kato and not the other way around!!!
PaulB
Jeff,
Spent some time studying easements last night and did some experimenting. Ignoring technical formulas etc, what is the rule of thumb for the length of an easement? I am thinking the minimum should be the length of the longest car / loc that would run on the layout and that anything greater than twice that might be nice visibly but would only be done given available space.
Speaking of turnouts, you will note that I selected Peco Fine Scale 55 with Atlas 55 Flex. I had heard very good comments from a couple of local guys with fairly large N Scale layouts. I was thinking about making my own (Fast Track) but that might be more that I can handle (time wise). Your thoughts on turnouts?
Paul
P.S. I also started to study sidings ...
peartree
Paul,
Ok, here goes. I had a little problem with AR, but it turns out to be another (maddeningly illusive) intermittent bug. These are one of the reasons why programmers are all prematurely gray (or have ulcers, or both). Anyway, that's taken care of. I'm attaching a mod of your layout (yes, using your choice for track systems). The Large layout I'm working on uses these two systems as well. The only thing I have against code 55 is that you have to be really picky about the wheels and flanges on your rolling stock. I'm not saying don't, I'm just saying be aware that it could be more work than you think. That aside, I like both the Atlas and Peco track. Taken together, they seem to include almost anything you could need for layout design, including #10 turnouts. Looking at your layout, I would recommend that you try to use #8 (Peco Long turnouts) or bigger for mainline track and the smaller numbers for the yard as you have done.
Everheart
Here is some info. Mountains of West Virgina & Kentucky along rivers. 1st Engines mix of steam and diesel the larges steam will be 4-8-8-4,as for diesel still researching that. 2nd longest train coal about 25 cars shortest about 12 cars mix for this ERA.3rd would like to keep max grade at 1.8%.
Lets start with Williamson at the top this will be a major Engine Service Facility for the Norfolk with side work on the L&N. The yard off to the right will be mainly coal with mixed freight inter-chance Engine Facility will have wash downs for Engines & Cars Machine shops for engines only along with fueling for both types, powerhouse,Rip tracks, oil storage to rep. the steam change from coal to oil burners, and tracks for parts-supply storage for the Williamson Facility. Car Repair will take place at Temple. As for switches would like to smallest to be 6 or 7. # 4&5 have been told tend to be tight and cause derailments.

RhB_HJ
Thanks Everhart, this info will help.
That means most of the passing sidings should be 7ft long, just on the off chance that two 25 car hopper trains meet. Or the dispatcher can juggle the meets.
More later.
Everheart
One more note Norfolk mainly Coal. L & N hardwood timber and mix freight. I known the L&N is famous for passenger service but this does not hold any interest for me.
peartree
I've taken a look over your map of that Williamson service center and I think you're going to find it's tough to pack into the space shown without going down to #5's at the very least. Unless you want to stretch it to like 15 or 20 feet, that is...