How time flies when one is having fun. Time to have a mini re-evaluation.
After just slightly less than a year I can say: yes, AR is a very useful tool and there have been a great number of improvements during this time. Track libraries added etc. etc. and IMHO the best of them all - improvements in how flextrack can be used/is handled.
As far as I'm concerned the best of the bunch when it comes to pre-built track (with lots of libraries) and the learning curve - that things actually fit is another advantage. Almost totally intuitive - as Jeff would claim? Not in my book, but it depends on what other graphic and design programs one uses and has used for a long time.
I'm looking forward to the updates in ver5.
PS It will be interesting to see how magazine readers react to layout proposals when they are able to get a large JPEG file for the scenery, an AR file for the track, along with pictures and videos of operations and structures on the prototype. I'll let you know! ;) :D
scwhipple
You have had a lot of experience with this and wish to know if there is an easy way to work with multiple levels. I went all through the help file, and all it says is " be sure to leave enough room between levels to let the trains go through". I was hoping to make a 5 or 6 level intertwined spiral with 5 separate lines, and am having a real problem visualizing the levels and keeping the lines from hitting each other. Have you ever done this with AnyRail?
Thanks!!
peartree
@HJ- "Almost totally intuitive - as Jeff would claim?"
Oh my, no :) I said it was almost totally intuitive TO ME... :D I don't presume to insist on that for anyone else. The program works the way I work when using pencil and paper, so I don't need anything else (except maybe a 3D viewer, of course).
@schwipple- HJ, here, is the right person to ask. He's the current King of Helixes!
glakedylan
scwhipple wrote
I was hoping to make a 5 or 6 level intertwined spiral with 5 separate lines, and am having a real problem visualizing the levels and keeping the lines from hitting each other.
@scwhipple: are you saying that you want to build a helix with 5 separate tracks each in ascending radius and also wish to have track(s) exit the helix at various levels of its climb? i might be able to help with describing how i do something of that with AR.
peace,
Gary
RhB_HJ
Welcome to the forum SC,
Not the exact same project, but ... basically look at it as each level beign a separate layer. Start at the bottom and add layer after layer. Add all the elements and objects that belong to a layer
only to that layer.
If you assign names or numbers to the layers doesn't matter.
An example of this method is the track plan in
this thread. Start at the lowest level 950mm and keep on going up, works with a helix orm any other layout configuration.
PS there's a slight delay on this message since SWMBO called for the movie - Wings of Desire - to start. ::) ::)
scwhipple
I should include a sketch and will do so when I get home. But what I wanted to do was basically intertwine 5 separate tracks in a sort of ascending and descending spiral, so that when the mountain covers it, the trains will come out at different and unexpected places in different directions, and also have bridges. A bit hard to explain in words, but if you have seen the trackwork on the Matterhorn at Disneyland it looks kind of like that. My board is big enough to have 5 loops using the 5 diameters of Marklin track, and at one end is this mountain thing and the other end is the city.
scwhipple
Here is a picture of what I am trying to do. It is why I bought AnyRail in the first place. I have been going crazy trying to get this to work. I thought having this program would help me visualize before building. As it is the blocks fall down and I end up breaking pieces of track which is expensive. Please let me know if working through this in AnyRail is possible. Thanks!!!

glakedylan
@scwhipple: as i see it, the needs are as follows--(1) determining how you will provide base for the track (plywood cut to shape and size necessary and bridge, trestles, etc. if there will be such and where they will be (2) with the base in place how you will support it at the heights that will be needed, especially in those places where track crosses over or under other track (3) with #'s 1 and 2 provided for, making sure you have places of access for maintenance and/or reaching for derailed trains or other issues.
now in terms of products, rather than a cookie-cutter plywood or MDF base for all the track you could possibly use woodland scenics risers which i have found to be a good solution. it provides a specific % of ascent and descent while offering a very light structure. where the tracks cross over above and below another you can simply add a bridge or like structure, even be it made to fit from pieces of styrene for added support to track.
the most important thing in planning, as i have found, it making sure you have sufficient spacing between track in terms of height where tracks cross one another and that those heights are within the percentage of grade you wish to keep with. AR makes it easy to do so once you are familiar with the setting of heights and slopes controls.
having an AR plan, and printing it out in 1:1 scale you would have a perfect pattern to cut base or where to install the woodland scenics styrofoam risers.
i hope something in this is of help.
all peace,
Gary
RhB_HJ
Hmmmmm, it's a bit much all in one take!
OK, let's tackle this the same way you would in AR.
-- First, lay down the approach tracks from either side, which are the four tracks at the lower edge of the picture and the upper right corner. They are your Level "0".
-- Second, decide what vertical separation you need between each level i.e. 4"/100mm or more? Depends on what you're running If you want to run the MGB and the GGB you'll need catenary. ;)
-- Third draw the outline of the surface on which all of this sits THis is still Level0. Should be easy enough since you layed out the track. Make your work area at least twice the dimension in width of the surface. That gives you room to move pre-assembled track segments around.
Make a copy of the surface and move it to the free space of the work area assign it the height of "Level1" i.e. x inches/millimeters higher than level zero.
-- Fourth, which tracks lead to the next higher level? For instance is the outer track from the top right corner on level 1 or level 2 after that really steep climb from "0"? BTW that climb is too steep!
BTW give those different layers different colours. You only want two levels to show at one time, more than that and it will get confusing.
To make use of what you have there use the 2x4 blocks (3 1/2" actual) as the level to level distance.
Since it is sectional track you could post each step as a new Any file i.e. Level0 and Level1 one file (Matterhorn01.any)the next level you rename the file as Matterhorn01a.any and so on 'til you get to the top level.
PS And when you start to post that Any file post it in the "Track Plans" section, thank you.
peartree
Wow! It's a wonder you don't have the tracks color-coded. Fortunately, AR can do that :). I suggest you set each incoming-outgoing track as a Section and color-code it. At least you'll see where each track is going, even when you try to hide it three levels down. :) Considering how difficult it will be to get at the track once it's installed, I would use something bigger than 4" for height difference. but I have big hands :)
Gary, don't forget to investigate using Trainplayer to check out how your layout holds up in operation.
glakedylan
Jeff wrote
Gary, don't forget to investigate using Trainplayer to check out how your layout holds up in operation.
Jeff...i have always wondered about Trainplayers...what scale is it in (the actual locos and cars seem to represent larger than N Scale) and if the scale can be changed to be accurate to that which the plan is made?
I need to get my version re-registered and am wondering if it is worth the $ given my N Scale aspirations and TP seemingly more representative of HO Scale.
Thanks!
Gary
RhB_HJ
Jeff wrote
Wow! It's a wonder you don't have the tracks color-coded. Fortunately, AR can do that :). I suggest you set each incoming-outgoing track as a Section and color-code it. At least you'll see where each track is going, even when you try to hide it three levels down. :) Considering how difficult it will be to get at the track once it's installed, I would use something bigger than 4" for height difference. but I have big hands :)
Gary, don't forget to investigate using Trainplayer to check out how your layout holds up in operation.
You missed the fact that a lot of this will be hidden inside a mountain i.e it is a "where will the train appear next" set-up. Size of hands will be a minor impediment. :D ;) :D
Colour coding the tracks as sections along with the different coloured levels (0 to 3.5"; 3.5 to 7"; 7 to 10.5"; 10.5 to 14") should get enough clarity.
The fun will start when the level transitions don't coincide with a joint in the snap track, that will invariable lead to a dip or peak in the grade percentage.
peartree
HJ,
Unless you have a 100% guaranteed way to keep trains from derailing (and alway at THE worst spot) then you'd better be able to get inside that mountain to retrieve said trains :)
RhB_HJ
Not me Jeff, not me! SC will have to deal with the Matterhorn, not me.
I'm just giving a hand transposing the multitude of different tracks to AR. So one can switch from on layer to the next without getting puzzled by the rest.
Murphy will always strike where it is hardest to reach. Back in 1974 I was part of a group building a largish display layout at a LHS; supposedly experienced model railroaders. Not only was there little clearance between the lower and upper level - which I pointed out - the hidden trackage wasn't installed as carefully as required - "Oh, you won't see this afterwards".
One of the few positive things I learned from that episode ... Kadee couplers are the cat's meow i.e. I proceeded to convert all my European rolling stock to KDs.
peartree
Exactly. I came to the same conclusion round about 1970. I had a medium size layout and I hadn't learned the finer points of tracklaying. But it all turned out ok, thanks to Kadee. I really loved it when they started selling truck/coupler all-in-one units. I was converting from HO to N at that point and it saved me weeks of time with a caliper and gauge. Of course I actually had TWO LHS's in those days (sigh).
RhB_HJ
The Hurray point with KD for Euro was when they started providing units that fit NEM-boxes. But by then I was mainly into HOm and having fun with 711 and 714 couplers, each type of car another little challenge.
scwhipple
Thanks to all for their comments. This got moved out of General and into Track Plans. I bought some of that plastic stuff from Amazon that was mentioned and it will be here next week. I also broke out all the old Marklin boxes like Ian suggested and it is working pretty well! The old ways are sometimes the best ways.