OK David, let me try to give my ideas how to set up the electric documentation.
First I would like to point out that I am looking for documentation. That is more than just a diagram or a drawing. Documentation also has reports with data, extracted from the drawing.
- Setting up a wiring plan starts with selecting the Booster Areas. Each Booster Area has its own power supply.
- In each Booster Area you can define Blocks. Blocks are logical parts of a track, used by your train-control-system (PC of electronic boards). Most often those Blocks have names.
- Each Block is made by 1 or 2 or 3 Segments. Each Segment is connected to a Occupancy Detector. The number of Segments is depending on the type of control-system in use. Often you will see Segments at the beginning and the end of each Block.
At this moment AnyRail has Segments only. The first extensions in AnyRail should be to identify Booster Areas and Blocks. They have to be identified by names and need some kind of report, to see wich Booster Areas and Blocks you have. Next to that, each Block should report the Segments it has. Also, AnyRail needs some kind of identification for turnouts, you have to give them a name or a number.
In attached design I tried to give you an idea.
- This track-plan has 3 Booster Areas. They are colored Blue - Green - Orange. In the track-plan you can easy see the position of those areas and the position of the area-separators.
- The little yellow rounded squares with green text represent the Blocks. The are numbered B01, B02, B03, .... B21. In the text you can see that each Block has the identification of its Occupancy Detectors (65.1, 65.2, .... 70.4) The numbering of the Segments is according to the Lenz system I am using.
- Because I used the colors for representing the Booster Areas, I can't indicate the Blocks and Segments in the AR design. All text information in the yellow squares is 'drawing only' and cannot be used for reports.
- In red text I named the turnouts.
Important for me is to have a visual representation in the track-plan, combined with some reports. Examples of such reports are now manually drawn in the plan. Here you can see which Occupancy Detectors are in each Booster Area and Block. And I have the (blue-green-orange) reports which show me how the wiring of the Detectors should go to the Segments.
As you can see, at this level of documentation I am not designing how the wiring is running under the board or which colors those wires should have. Also it is not important how the electronic components look like - I don't need a visual Object in this diagram.
This part of my documentation tells me how to set up the corresponding plan in my train-control-system on my PC. That system needs to know how Blocks are connected, which Turnouts are between Blocks and which Detector-numbers are in the Segments.
In an other post in this Topic I will detail more how I tried to deal with wiring.
Sander
