Three months in the making here is the first revision of my Ruhr Valley inspired layout. My intention was to have a sizable amount of passenger trains staged in the the lower level. They are being summoned as desired and run through the main line of the upper level. The upper level provides for all the eye candy and action including a Bw, a coal mine (Trix Zollverein) and steel works (Trix Hochofen und Giesshalle). Furthermore there is a sizable yard with a hump yard (Ablaufberg).
Status:
Lower level is fully build and upper main line is laid loosely on .5" to 1" styrofoam.
Guys, let me know what you think.
Thomas
(Edited for better readability)
Upper level:

Lower Level (Upper level -10 in):
Upper Level