Hi All,
I have been fiddling with a potential n-scale track plan. This plan has the potential to become very big, but I need to focus on phasing the construction. For instance, the staging yard can easily be built at a later phase. A downtown trolley could be added later. My main limitation is reach, so i am trying to keep all switches within 24 inches of the front.
The concept is to have an urban system with a leg for longer passenger service. Anyway, i welcome your thoughts.
