Jeff wrote
If you're going for P4 standards, why not go whole hog and use S4 instead?
Because to me going P4 is pretty much the whole hog. I did some calculations on the difference between P4 and S4 and we are talking 0.05 - 0.2 of a difference between the two, I converted that into real life and the difference is about 6 or 7mm's - half an inch in real life. I'm a stickler for detail, but not that much. Also the larger radius curves required in P4 would need to be even more gradual in S4.
Also to go S4 would mean a lot of the available P4 stuff that I can get my hands on wouldn't be as much use, nearly all the trade is geared to P4. It's only the experienced 'masters' who seem to go S4, being a beginner who's only made two turnouts (from 2 different kits) and a couple of wagons I think I'd be asking for trouble to be honest.
Now I can notice 1mm difference to real scale becasue it's 3 inches and sometimes quite noticable,but not a 6th or 12th of that. I'd have to really strain.
S4 direct scaled down dimentions for points and wheels:
Check Gauge 18.25mm's
Crossing Flangeway 0.58mm's
Between Checks 17.67mm's
Wheel Back to Back 17.87mm's
Compared with P4 slight compromise standards:
Check Gauge 18.15 - 18.20mm's (0.05mm difference)
Crossing Flangeway 0.65 - 0.68mm's (0.1mm difference)
Between Checks 17.47mm's (0.2mm difference)
Wheel Back to Back 17.67 - 17.75 (0.12 - 0.2mm difference) If my maths is correct!
http://www.scalefour.org/forum/digests_download.php?f=1-2v2-4.pdf
Tweaked plan...
For the off scene areas I might ocnsider soldered track as it would be quicker I'm sure. I've built 1 Exactoscale turnout and one C&L turnout, both seem to be happy with the small amount of stock I have so I'm quite confidant I can do soldered points, possibly with less sleepers. I'm comfortable soldering. Again though as a 1st P4 layout I think this might be a bit OTT...?
I've been tweaking the above plan in Anyrail and the top right turnout is sorted, the left two 00 ones are still the same representing custom radiai and I've added a fiddle yard idea. A few points would have to be custom built and a couple of curved cross overs.

What you think? Also any suggestions on the current track plan (that'll probably be tweaked alot more)