Here is a version of John Allen's Gorre and Daphetid using KATO Unitrack.
It's larger than normal (44"x74") because I wanted to use large radius curves, #6 turnouts and to limit the grades to 2.2%. The smallest radius is 315mm.
I wanted to justify both bridges in Gorre, so I added a second industrial track (Gorre Wood Processing). In addition, I added a small run around in Daphetid. The run around caused the trestle to be replaced with a viaduct over a water fall.
Other than that, I tried to stick with the original.
Operation will go something like this.
Get the Shay out. Don't forget the caboose.
Pick up one empty flat car from the Burlington Interchange and deliver it to Daphetid Logging.
Pick up one flat car filled with logs from Daphetid Logging and deliver it to Gorre Wood Processing.
Pick up one flat car filled with cut lumber from Gorrre Wood Processing and deliver it to the Burlington Interchange.
Put the Shay and the caboose away.
Get the RDC out.
Eastbound. Pick up and drop off passengers and mail at Gorre West, Gorre East and Daphetid.
Westbound. Pick up and drop off passengers and mail at Daphetid, Gorre East and Gorre West.
Put the RDC away.