And here the rest. The footprint of the available space is 30m (98.4ft) wide by 40m (131.2ft) deep.
As usual I spaced "things" far enough apart to a) visually separate them and b) allow enough standing room for the operators at the different locations.
The mine railway delievers straight to the smelter in town. The logging outfit brings the loaded disconnects down the mountain and stores them at the junction. Two sections of disconnects are then assembled to a train to deliver to the mill.
