I'm installing a truss bridge and don't know how exactly it should be done. My bridge abutments have an "L" step at the top and I'm thinking the actual bridge sits on the lower step. Its an open deck type and the beams sit below the top step by just a little more than the thickness of a tie. So in the real world would the rails sit directly on this concrete/stone ledge or would it be cut down to where the ties sit on top of it?
I've tried to find a picture that shows it but none I've found really show that detail.
Also I'm wondering if I should use the bridge track and if so should it be used just on the bridge or run past both ends some.
TY, Spike
