This is my N scale adaptation of a section of a little known short line built and operated by Canadian Pacific between 1876 and 1989, connecting Montreal to Mont-Laurier in the Laurentian Mountains in Quebec.
The track is Atlas code 55 designed with sectional tracks (to establish the geometry) that will be changed to flex track. It’s built as a loop to loop mostly for a single person operation. The hidden tracks sections establish the grade and make the train disappear from time to time so that the main line appears longer than it is. Because the yard is small, a staging section is added under the main line to store additional cars.
The prototype was a single line hopping from village to village (40 stops from start to end in 1920) for a total distance of 158.1 miles. The layout attempts to represent the last 90 miles of the line.
Some historical facts:
In 1872, during a very cold winter, Parish Antoine Labelle, who was the father of the colonization of the Laurentian, sent a convoy of 80 carriages loaded with cut wood to heat the homes of the freezing Montrealers proving the viability of a train line trough the Laurentian Mountains.
9th October 1876: first section from Montreal to Saint-Jerome.
1909 the line arrives in Mont-Laurier where it ends.
1930: road 11 (road 117) is now opened during the winter months.
Winter of 1934-1935: more than 40,000 skiers will tour the Laurentians on what had become known as the Ski Train. For the period, the line became the busiest in Canada.
1950’s: Motorized transportation replaces the train after the construction of Highway 15.
1960: interruption of the passenger service.
1978: last attempt to revive the passenger service.
1981: the project is abandoned and only freight trains will run until 1989.
1990: the short line is dismantled.
1996: the line without its track became the longest bicycle trail in Canada, going from Saint-Jerome to Mont-Laurier (approx. 125 miles).
Comments about the layout are welcomed since this is my first attempt at building a layout.
