This one has been on the burner - on slow simmer - for some time. Intended as a switching layout to take to shows it needed to be designed so everything - including the structures, rolling stock etc. etc. - would fit in our mini van (Pontiac Montana).
Mode of operation: a small Diesel Railbus (HWL) runs on the outer (RED) loop, a Aristo Critter does the switching of the industries. The complications start when the switcher needs to run around the train and needs the Diesel Railbus to get out of the way. Further complications are the trailing and facing sidings of the industries, along with the cars that need to be picked up prior to others being dropped off.
Aimed at the young computer wizards who can solve any game problem in practically no time. :P :P It will be interesting to watch how they figure this one out. Lets say it is one level up from the TimeSaver. ;D ;D
PS the spur running off the layout will be used to add/remove cars - similar to an island layout where the ferry delivers the cars.
