Juup
Hi All,
New to this forum. Been playing around with Anyrail for a couple of months now, trying to design a TT layout for a loft space. Quite ambitious I think - it will take me years. This year's task is to insulate and to built baseboards...
I've always had an interest in German rail. As a kid me and my brother started a Fleischmann N scale layout, but quickly ran out of money. As a young adult I did a lot of train travel in Germany and surrounds. Now located in the North of UK, but still with interest in German trains. I now have a loft space, a bit of money and a bit of time...
I've set my mind on TT scale. Odd perhaps, but I like it being in-between HO/OO and N. I also like the challenge of finding stuff in TT which is a bit harder.
The concept for the layout attached here is a main station from which long (hopefully close to prototypical) German epoch III and IV intercity trains depart and arrive (or return if you like). The mainline gives the impression of a double line, but is in fact an out and back loop - not sure if that makes sense. There is a point to point goods line as well. I suspect I may have crammed in too much, but tried to make use of tunnels and height differences to separate things. I do like the extensive station area and the very long mainline run. Not too interested in modeling cities etc. Any comments/feedback/suggestions welcome; I'm a newbie so please go easy on me :)
Juup
RhB_HJ
Hi Juup,
Welcome to the "Fun" place!
I like the long, quasi double track main, staging looks OK. What could do with a bit of refinement is the "Vorbahnhof" approach and storage trackage before the platform tracks.
If you have a mix of trains it would help to have layover tracks for those, not all trains arrive and then depart again. Dead end stations have a few distinct features.
1. Trains that terminate are usually pushed back to the storage trackage.
2. Engine powered trains require an engine change prior to leaving again - unlike push-pull sets.
3. Those engines require ready tracks.
4. Longdistance trains that use the terminus as an intermediate stop may change the consist - add or remove cars.
5. Express baggage and mail could originate and/or terminate here - extra moves with those cars.
6. Quite often there is direct access to the downtown post office - more car moves.
7. Most of those extra features will only require additional track, the actual structures can be in relief with the backs open to the operating aisle.
8. The green freight line needs a reason to exist i.e. running a single track into the terminus makes no sense, having a set of crossovers at the "remove panel" location would be more like it. This would allow you to use the outer most part of the loop as part of the freight mainline. It will also increase the complexity of running that main since you have to fit freights in between the rest of the traffic.
9. Getting from the access line for the marshalling yard to the mainline proper could be either an over- or an underpass.
Modifications coming up, probably tomorrow since my back is really tired this evening. :( :(
And one more question: is this going to be conventional DC or DCC?
Juup
Hi RhB_HJ (or is it Hans-Joerg),
Thank you for some great comments. I think your points highlight exactly what I need to do next. That is, I need to take a step back and think through what kind of activity goes on in the kind of station that I am modelling - yes, accepting then that the large station is central in the concept that is evolving. Your suggestions about the kind of traffic one might see in dead-end stations and the kinds of freight (e.g. baggage and post) feels right, but I really need to start researching; perhaps pick up a good book on the subject. Thank you for pointing me in this kind of direction. I can add 'research' to my 'to do' list, alongside insulating and it probably needs to preceded planning and building the baseboards...
A couple of questions. When you say 'layover tracks' and 'storage trackage', if I have about 9 tracks approaching the platform area, and only about 4 of them need to be clear to run in and out of the various platforms, does this not mean I have about 5 layover tracks? Or are layover tracks / storage trackage separated somehow from the tracks on which you approach the station? Maybe I should be checking out some German stations on Google earth :)
Also, your suggestions in 8 and 9 - I am not sure I understand you here. Do you mean to keep the green freight line, but have it go e.g. below the station approach, or perhaps weer off a bit before the approach to meet up with the double mainline around where the 'lift out panel' to access the staging is? Did you consider the hidden staging in this suggestion? The staging layer needs to be revealed in the file I sent. More generally, I take your point about creating a reason for the freight line... that comes back to the kind of activity one might expect going on in a station like this. Increasing the complexity of running, while at the same time reducing the amount of track overall would be great.
I will be doing DCC for sure, but nowhere near considering the challenge of this yet.
Thanks again!
Juup
RhB_HJ
Hi Juup,
Attached is the quick sketch of how to integrate the "Green Line"
Juup
That makes your suggestion clear - thanks!
Juup
peartree
Also keep in mind that incoming/outgoing 'freight' depends a great deal on intended locale and era. For instance, operations that back in the 1940's would require ice [passenger service, fresh food / produce], won't need that in the 1990's, since there is now more efficient air conditioning and refrigeration. So, if there is ice needed, then there must be (at the very least) a way to get that ice on-site and a way to get it into the cars that need it in a timely manner. For long-distance passenger service, that concept applies to food for passengers. And if there are animals coming in or out...!
So, you do have some work to do before closing the book on design.
RhB_HJ
Hi Jeff,
The Germans did things a bit differently back in Eras 3 (1950-70) and 4 (1970-90). ;)
Back in Era 3 there was still a lot of LCL, two axle freight cars were predominant and a lot of rebuilt passenger stock was still in service. As far as freight was concerned it was mostly mixed trains even for longhaul. Unit trains were fewer and shorter, used mostly in the heavily industrialized areas of NRW (Ruhr Valley etc. etc.).
Considerably more connecting tracks even to smaller industries, busy freight sheds (LCL and express).
Era 4 was the big deviding line i.e. 1969 marked the changeover to the computerized numbering system (UIC) of motive power and rolling stock. Railways also started to go for colour in a big way on the passenger equipment and reinvented their corporate looks/logos.
International longhaul passenger trains had any number of colour variations in the consists .... 'til the railways one day decided to order common car types (UIC designs) and standardized the colour schemes, too.
Era 4 also brought a lot of no equipment - both motive power as well as rolling stock.
Another wrinkle in the European scene: there are shifts in eras between the railways of different countries, less uniformity than one would expect. ;)
BTW when I was still doing HO SG and NG in a big way I picked 1969 as the year; they didn't get around to renumbering everything at one go. Only the interchange traffic between countries conformed in order to keep order in the mess. For a time it was even possible to have overlapping numbers. :o :o
Lots and lots of possibilities and reasons to come up with all manner of excuses. ;D ;D :o
peartree
And these days you could have some fun modeling a tourist line :) Then you could have modern high-speed rail sets and steam engines operating together.
Juup
Hi All,
Lots of excuses - I like that. Also the idea of a tourist train. I have an old Preussian train - a BR56 I think with some matching passenger cars. However, if I model something in the 1970s, was the trend of tourist steam engines around already then? Steam also means a turntable or a loop... can I fit that in my dead-end station?
On dead end stations, I found a listing of all dead end stations in a long list of countries; most European countries and lots of non-European ones including the US. In German they are called 'Kopfbahnhof'.
http://de.wikipedia.org/wiki/Liste_von_Kopfbahnh%C3%B6fen
(link looks like gibberish towards the end - a German letter - but works)
I am working my way through the Germany list (I speak Dutch so do okay reading German) to find a station or stations I might use for ideas of what my own kopfbahnhof might be all about. So far found Kiel to be about the right size... it is close to a Baltic sea ferry port but no, there is no roll-on roll-off. However, Kiel is a bit too modern in its architecture - don't like it. Here is one that looks just wonderful:
http://www.fotocommunity.de/pc/pc/display/19651718
Anyone know what the green industrial building to the right is? ??? Is it to fill coal into steam trains?? Looks a bit too modern for that, but the tracks go right through the white garage-like thing. The foto was taken in 2009.
However, lovely as it is it takes me away from intercity to regional trains. I suspect I will depart from prototype here and there ;D
Thanks so much for getting me thinking!
Juup
RhB_HJ
Hi Juup,
Fire up Google Earth and have a look. Input is "Bad Harzburg, Bahnhof".
German Google sheds light on the loading facility, ballast for railway tracks! Check out this thread
http://www.drehscheibe-foren.de/foren/read.php?4,3972883
Being multilingual sure does have certain advantages, eh. ;D ;D
Juup
Am using Google earth already, but the website with the trains collecting ballast is intriguing. Thanks for that! I am liking this kopfbahnhof more and more.
Juup
peartree
You're lucky! :) Tourist railroads have been around since mainline steam went out of favor. Even in the 60's, there were tourist roads and plenty of 'Fan trips' on existing roads without steam in scheduled service, at least here in the States. I know that in the UK, there were already tourist lines using the narrow gauge railways in Wales and collectors were already buying up steam for use in their own tourist lines.
RhB_HJ
From the first layout I built here in Canada (1969) to my present model railway in the garden - no, that is not the same as a garden railroad ::) ::) ;) - it has been point to point or point to loop. When required, desired and possible I'd add the continuous run connection track to run ïn "merry circles" like so many think is absolutely necessary.
We had one version of the HOm RhB that required 13 people tocover all the jobs and it was very busy - just like the prototype. Admittedly that wasn't to everyone's liking since one had to pay attention, had to learn how an employee timetable worked and couldn't just goof off i.e. it required a dedicated bunch of "nuts".
This was all in the pre-DCC days, which meant one had to also pay attention which cab one was on (eight mainline cabs) and a few other items.
Of course I designed and built different layouts for customers and if they like to run in circles, they get to run in circles. ;D ;D ;D
Juup
Hi Jeff, Hans-Joerg and Others,
Given the dead end station concept, I think I am sticking to a point to loop concept with the passenger mainline (and reevaluating the point-to-point addition of a freight line). I don't want a duck-under for reasons unrelated to the modeling.
I am continuing to research German 'head' stations and what they may have been like in the 1970s (mid-70s?) . On my list of stations that are likely to influence my own final design are:
Kiel
Bad Harzburg
Hamburg Altona
Wiesbaden
These are small and medium stations. I am avoiding the confusion of mega-stations like e.g. Frankfurt.
Motivated by your various comments, I am discovering that there seems to have been a re-building effort in the early 70s, including an updating (destruction!?) of the main station buildings and the removal of the turning circles and service areas for steam trains. The mix of types of traffic on these stations varied (and varies); the present location of storage trackage also varies. This adds to the number of 'excuses' :) I can come up with in defending what I model. German websites have a wealth of information on specific developments over time.
All that said, I am unlikely to come up with a version 2 of my Anyrail layout for a time now. Perhaps a month later? perhaps longer? It will happen at a pace commensurate with other responsibilities like work and family. It is good, though, to have this thread and this community as a reference point.
Juup
peartree
Yes, many others have found our community valuable. A good part of it is looking at a problem or eituation from a different point of view. Remember always that real railroads have had to do the same thing- when faced with a space or routing problem, they find a work-around. BUT, working with AnyRail "All that said, I am unlikely to come up with a version 2 of my Anyrail layout for a time now"??? AnyRail is the real gem in layout design software, because you can save a version of your layout for every little change you make, then go back a month from now and look them over to see if any of them is the right way to go. Or one of them may spark a thought about a new direction. Of course one of the very favorite sources for a layout design is the Alternate Time Line method :). One can take a real-word design and make whatever changes suit your taste and space, then take the view that this is how it might have been done if different people were involved. Or maybe there was a competing railroad that was taking away some important freight- that often lead to concentrating on passenger traffic and the building of 'Grand Stations' to impress the public or even running more trains of freight than was really justified, just to provide 'better service' to a town. So you see, there are many, many ways to go in layout design. You really don't have many barriers to designing whatever layout makes you happy. The only thing that can get in your way is not spending a little time designing!
RhB_HJ
Right on Jeff,
Now would you like to correspond with some of the people I know who just want to throw down some track and be done? ;D ;D ;D
You'd probably get as ticked with that bunch as I do. :o :o Luddites of a different streak.
peartree
Ummm, no. But I have to respect their wishes. In the end, it's their layout. They can have a simple oval with no turnouts, for all of me.
RhB_HJ
I don't have a problem with that either, what rubs me the wrong way: they don't see the value of planning as such. Do everything by the seat of your pants and re-do as necessary. I used to say: we'd still be living in caves! ;D ;D :)
Juup
You will be happy to know then that I am busy planning improvements - about 50% towards version two. I am siting a small station in the top right corner as per your suggestion. Green freight line is gone. Trying to reduce the size of the main station just a little so I can have room for a locomotive depot of some kind close by... with electrics and diesels such a depot takes less space than a steam loco depot, right? And trying to develop the storage trackage to either side of the station approach. A lot of to keep track of - no pun intended :)
Juup
peartree
You might be surprised to find out that engine service is engine service. It takes a bunch of space, no matter what sort. The only difference is that a coal tower/watering hoses/sand pipes is replaced by sand pipes/fuel oil tanks/oil unloading hoses and pipes. The electrics are easier. As long as you keep a decent warehouse full of spare parts, all you need is sand and a shop for heavy service/replacement. In all 3 cases you still need tracks for incoming, outgoing, and storage-while-waiting-service. I guess in space wars, electrics do win out, simply because they have no on-board fuel needs.